Similar Projects
Basin 10 and 14 Capacity Improvements, Schedule I
Infrastructure
Bidding
$12,000,000 est. value
Fort Smith, AR

Installation of New Water Meters and Meter Boxes and Repairs
Infrastructure
Bidding
$400,000 est. value
Tyronza, AR

Water Project
Post-Bid
Less than $166,000 est. value
Nashville, AR

Water System Improvements: Contract II - Water Line Extension and Chlorination Facility
Post-Bid
El Dorado, AR

Water Quality Demonstration
Results
Less than $1,412,520 est. value
Conway, AR 72032

Raw Water Supply Transmission Pipeline Contract 5
Results
Less than $11,200 est. value
Hot Springs, AR

Cook Road Waterline Extension
Infrastructure
Bidding
$98,000 est. value
Texarkana, AR 71854

Highway I-49 18 Water Main Extension
Infrastructure
Post-Bid
Rogers, AR

Highway 9 Water Line Relocation
Results
Salem, AR

Sewer Service Line Replacement at Cayman Villa and Goff Courts
Infrastructure
Bidding
$70,000 est. value
Jonesboro, AR

Dierks Water and Sewer Improvements
Infrastructure
Post-Bid
$165,000 est. value
Dierks, AR

Stone Links - Multi-Pipe Maintenance Rehabilitations
Infrastructure
Results
North Little Rock, AR

City of Ward Water Meter Replacement Project
Infrastructure
Bidding
$500,000 est. value
Ward, AR

The East End 2021 Water Improvements Contract - 2 Water Line Improvements
Infrastructure
Post-Bid
North Little Rock, AR 72100

Construction of the Highway 141 Water Line Relocation
Infrastructure
Results
Paragould, AR

Last Updated 06/09/2022 08:29 AM
Project Title

Elm Springs and Highway 112 Brush Creek Water Line Repairs

Physical Address View project details and contacts
City, State (County) Elm Springs, AR 72762   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally includes the installation of concrete caps over existing 6-inch water lines at two locations that are currently exposed within the creek, creek bank stabilization (with 18"-24" Rip Rap) as shown in the plans and all other items.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.
Division 40 - Process Integration.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents