Similar Projects
Manitou Springs Creekwalk Trail Phases 4 and 5 Survey, Row and Design
Post-Bid
Manitou Springs, CO

Flying Horse Pond 1 Retrofit
Infrastructure
Post-Bid
Colorado Springs, CO

Construction of The Kane Ranch Open Space Project
Results
CO

RTI Infiltration/Drainage
Results
Less than $100,000 est. value
Fort Carson, CO 80913

Flying Horse Detention Pond 1 Retrofit CM and Geotechnical Engineering Services
Infrastructure
Post-Bid
Colorado Springs, CO

North Chelton Road Drainage Improvements
Results
Colorado Springs, CO 80903

Manitou Avenue from Park Avenue to Serpentine Drive Construction Project
Results
Manitou Springs, CO 80829

Dry Creek Stream Stabilization - Phase II
Results
Colorado Springs, CO 80947

Bear Creek at 8th Street Channel Restoration
Results
Colorado Springs, CO

Sand Creek Downstream of East Fork Confluence Stream Stabilization
Results
CO

Pikes Peak Greenway Trail Improvements - I25 To Cottonwood
Results
Colorado Springs, CO

Monument Creek at Talemine Project
Results
$1,000,000 to $1,500,000 est. value
Colorado Springs, CO

Homestake Surge Pond Rehabilitation Project
Results
CO

Clear Spring Ranch Facility Drainage Improvements
Alteration
Results
$400,000 to $450,000 est. value
Colorado Springs, CO

Slip line and Extend Culvert
Infrastructure
Results
Less than $1,000,000 est. value

Last Updated 12/21/2021 01:24 PM
Project Title

Rocky Ford SWA-Irrigation Pipeline

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $70,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnish & install an irrigation pipeline and concrete diversion box.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents