Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Blanding Site Lighting Upgrades
Infrastructure
Bidding

Pressurized Irrigation Metering Project - Phase 1
Term Contract
Bidding
American Fork, UT

General Contractor and Electrical Contractor Timpanogos
Addition
Post-Bid
American Fork, UT

Provo River Trail Solar LED Lighting
Post-Bid
Provo, UT 84606

Phase II Street Lighting Project
Results
$500,000 to $600,000 est. value
Orem, UT 84057

Electrical Services
Results

Multi-Site Backup Generator Installation
Post-Bid
Provo, UT 84604

DFCM Construction Pre-Qualified Electrical-Utah National Guard - American Fork Emergency Generator
Results
$295,000 est. value
American Fork, UT 84003

Tanner to Mountain Vista OPGW Installation
Post-Bid
Provo, UT

Lehi City North Point Substation Transformers
Alteration
Results
$7,000,000 est. value
Lehi, UT

Keller Building LED 2021
Alteration
Post-Bid
Orem, UT

DFCM Construction - Pre Qualified Electrical - UVU Campus Lighting Upgrade PH3, Lakeside
Alteration
Results
$150,000 est. value
Orem, UT 84058

DFCM Construction - Pre-Qualification-General/Mechanical/Electrical/Roofing/Paving/Civil Contractors
Term Contract
Post-Bid

Dfcm Construction - DHS Orem Dcfs/Dhs Bldg Fire Panel Replacement
Term Contract
Results
$76,803 est. value
Orem, UT 84057

Reported 01/29/2022 12:00 AM
Project Title

North Point Substation 15KV Switchgear

Physical Address View project details and contacts
City, State (County) Lehi, UT   (Utah County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

North Point Substation Switchgear will be located at Lehi City, which is at 4,600 feet above sea level. This purpose of this RFP is to order two (2) lineups of 15kV metal clad indoor switchgear to be installed by manufacturer into a single building. The building will be by manufacturer and come complete with 15kV internal bus duct connecting both lineups, 2 stand alone relaying panels operating external equipment, communications equipment and required ancillary items as listed in these specifications. The switchgear building will be for the “North Point Substation” and will include two (2) separate sections consisting of two (2) main breakers, one (1) tie breaker and eight (8) feeder breakers, these sections will be connected by Manufacturer supplied bus duct within the building.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents