Similar Projects
RFP - Stream Restoration at Forty Acre Hp
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29201

Vector Control New Lab Facility - Richland County
New Construction, Infrastructure
Conception
$750,000 CJ est. value
Columbia, SC 29201

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

Biscuitville / Irmo - Rebid
New Construction, Infrastructure - 2,734 SF
Bidding
$1,000,000 CJ est. value
Irmo, SC 29063

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Jackson Creek Site Restoration Project
Infrastructure
Post-Bid
Columbia, SC 29206

Bitternut Pump Station Improvements (WM4574) CDBE - Phase II
Renovation, Infrastructure
Results
$833,948 CJ est. value
Columbia, SC 29209

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Clutch Coffee - Devine Street / Columbia
New Construction, Infrastructure - 798 SF
Construction
$250,000 CJ est. value
Columbia, SC 29209

Aldi #144 / Irmo
New Construction, Infrastructure - 21,831 SF
Construction
$5,500,000 CJ est. value
Irmo, SC 29063

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Colony Northpointe Recreation Project (Design Engineering for Bridge)
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Columbia, SC 29201

Metal Fabrication and Machine Shop - LaserForm & Machine, Inc
Addition, Demolition, Infrastructure - 20,000 SF
Conception
$5,000,000 CJ est. value
Columbia, SC 29203

Patterson Road Sidewalk
Infrastructure
Design
$250,000 CJ est. value
Columbia, SC 29209

Last Updated 07/03/2023 02:39 PM
Project Title

Rosewood Area Water System Improvements Phase 1

Physical Address View project details and contacts
City, State (County) Columbia, SC 29205   (Richland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $230,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to replace the failing water infrastructure and provide the Rosewood neighborhood and surrounding area with improved water quality. The project scope includes constructing of approximately 40,000 LF of water main, renewing services, replacing fire hydrants, and abandoning portions of the existing system. Phase 2 and 3 will be bid out after design and permitting has been completed. It is the goal of the City of Columbia, SC to maximize opportunities for historically Disadvantaged Enterprise Businesses (DBEs) including, but not limited to, Small Businesses (SBEs), Minority Businesses (MBEs), Women-Owned Businesses (WBEs). The City has implemented an overall citywide 15% goal to encourage socially and economically disadvantaged business participation. This goal extends to bidders, subcontractors and suppliers on its procurement and contracting offerings.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents