Similar Projects
Medicine Bow Roads Phase 2 Project
Infrastructure
Bidding
Medicine Bow, WY

Gravel, Grade and Apply Magnesium Chloride Dust Control to Rim Road
Infrastructure
Bidding
Bondurant, WY 82941

WY Nps 2017(1) Moose Wilson Road Phase 1
Term Contract
Post-Bid
Jackson, Teton Village, WY 83001

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

2022 Asphalt and Concrete Repair Projects
Infrastructure
Bidding
$300,000 est. value
Cheyenne, WY

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

2022 Cape Seal Project
Infrastructure
Bidding
$200,000 est. value
Green River, WY

Burgess Road (Nfsr #15) Road Improvements
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Sheridan, WY 82801

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Mule Creek Junction - Newcastle (US 85 and US 16)
Infrastructure
Bidding
$200,000 est. value
Lance Creek, WY 82222

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

Sweetwater Jct. - Riverton (Beaver Rim South & Middle Section)
Infrastructure
Results
Riverton, WY

Reported 04/22/2022 12:00 AM
Project Title

NWC Asphalt Maintenance Project - FY2022 and FY2023

Physical Address View project details and contacts
City, State (County) Powell, WY   (Park County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes repair of potholes with asphalt patching, crack sealing, slurry sealing, striping, and other improvements of multiple campus parking lots.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents