Similar Projects
Last Updated | 08/02/2022 02:10 PM |
Project Title | STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant |
Physical Address | View project details and contacts |
City, State (County) | Mount Hope, WI 53816 (Grant County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Obtained from a credible source, Awaiting verification, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $9,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 2 , 2022, an engineer has been selected. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Solicitation ID: SW-01 County :22 - Grant County Limit : Forest Lane to 400 Ft S Cth Vv Anticipated Construction Cost: $8,000,000-$8,999,999 59640102 The pavement needs replacement Rehabilitation project of 1.57 miles from Forest Lane to 400 south of CTH VV located within in the Village of Cassville in Grant County and will replace the existing pavement of asphalt overlaid concrete. Other items include storm sewer repairs of manholes and catch basins, curb ramps in Cassville will be upgraded, and staging plans to incorporate the storm sewer and curb ramp improvements. The project is not on the screening list and the consultant will perform a Phase 1 Architectural and Historical investigation. Advertised Fixed Fee %: : 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Cassville - Patch Grove *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |