Similar Projects
O'Reilly Auto Parts (HRO) / Hernando
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Hernando, MS 38632

Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

State Aid Project Overlay Getwell Road and Robertson Gin
Infrastructure
Bidding
$3,000,000 CJ est. value
Hernando, MS 38632

State Aid Project Overlay Getwell Road and Robertson Gin
Infrastructure
Bidding
$3,000,000 CJ est. value
Hernando, MS 38632

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Slurry, Micro and Scrub Seal
Term Contract
Post-Bid
MS

Hernando Hills Elementary School Addition
Addition - 68,875 SF
Results
$1,473,000 est. value
Hernando, MS 38632

US Highway 51 and Kapik Drive Transportation Improvements
Infrastructure
Results
$2,114,285 est. value
Hernando, MS 38632

The Cascades
New Construction, Infrastructure - 400,000 SF
Pending Verification
$385,000,000 CJ est. value
Olive Branch, MS 38654

The Cascades
New Construction, Infrastructure - 400,000 SF
Pending Verification
$385,000,000 CJ est. value
Olive Branch, MS 38654

Bridges at Camp Creek
New Construction, Infrastructure - 120,000 SF
Design
$37,000,000 CJ est. value
Olive Branch, MS 38654

Landers Center: Southeast Parking
Infrastructure
Bidding
$500,000 CJ est. value
Southaven, MS 38671

Getwell Road Widening
Infrastructure
Post-Bid
Southaven, MS 38672

Abraham House of God
New Construction, Infrastructure
Results
$2,800,000 CJ est. value
Horn Lake, MS 38637

Last Updated 05/04/2023 12:01 AM
Project Title

Chickasaw Elementary School Overlay Project

Physical Address View project details and contacts
City, State (County) Olive Branch, MS 38654   (DeSoto County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $246,153 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For any questions relating to the electronic bidding process, please call Central Bidding at 225-810-4814. Partial Sets will not be issued. The Owner reserves the right to reject any and all bids on any or all projects and to waive informalities. Proposals shall be submitted on proposal forms provided with the specifications and must be accompanied by Proposal Security in the form of Certified Check or acceptable Bid Bond in the amount equal to at least five percent (5%) of the Base Bid: such security to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal, execute contract and post Performance Bond in the form and amount within the time specified. The Bid Bond, if used, shall be payable to the Owner. Bids on the Project must be received on or before the period scheduled for the project and no bid withdrawn after the scheduled closing time for the project for a period of forty-five (45) days. All bids submitted in excess of $50,000.00 by a Prime or Subcontractor to do any erection, building, construction, repair, maintenance, or related work must comply with the Mississippi Contractors Act of 1985, by securing a Certificate of Responsibility from the State Board of Contractors.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents