Similar Projects
Bridges and Box Culvert Renovations at Wind Cave National Park
Design
$250,000 to $500,000 est. value
Hot Springs, SD

West Saint Louis Pavement Rehabilitation
Infrastructure
Bidding
Rapid City, SD 57702

Tower Road Stabilization - Road Reconstruction Phase
Infrastructure
Bidding
Rapid City, SD 57703

SD NPS Pp 2020(1), Pavement Preservation South
Post-Bid
SD

West Ash Avenue CIPP - 2020
Post-Bid
Loomis, SD 57301

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

The Crossroads Mixed Commercial Development
New Construction, Demolition, Infrastructure
Pending Verification
Sioux Falls, SD

St. Cloud Street Reconstruction - 5th Street to Highland Court
Infrastructure
Bidding
Rapid City, SD 57701

Saint Patrick Street Reconstruction
Post-Bid
Rapid City, SD 57701

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

5th Street Panel Repair - Minnesota to Stumer
Infrastructure
Bidding
Rapid City, SD

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Union County Road 1B Asphalt Concrete Overlay
Results
$2,774,569 est. value
Elk Point, SD

IGT Subdivision Improvements -Water and Sewer
Infrastructure
Bidding
Rapid City, SD

Last Updated 08/03/2021 03:56 PM
Project Title

Street and Utility Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Chancellor, SD   (Turner County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,430,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents