Similar Projects
Sunglow and Lockheed Median Improvements
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
El Paso, TX

Transit System Site Improvements
Post-Bid
El Paso, TX

Tornillo Guadalupe International Bridge (TGIB) Sidewalk Repair Project
Post-Bid
El Paso, TX

ADA Compliant Sidewalk - Building 20709
Results
$25,000 to $100,000 est. value
El Paso, TX

El Paso Parking Lot Repair
Results
El Paso, TX 79915

Old Dominion Freight Line - Parking Lot Expansion
Addition, Demolition
Construction
El Paso, TX 79905

El Paso Hondo Pass Parking Lot Repair
Results
El Paso, TX 79904

Montana RTS Pedestrian Enhancements
Results
$2,000,000 to $2,800,000 est. value
El Paso, TX 79901

Pedestrian Safety Improvements
Results
Less than $1,727,783 est. value
TX

Modify Existing Ramps, Signing and Pavement Markings
Results
Less than $2,024,004 est. value
TX

Central Business District Phase IV
Results
$13,500,000 to $14,500,000 est. value
El Paso, TX 79821

FM2529 - Hazard Elimination and Safety Highway
Results
Less than $1,723,464 est. value
TX

Gene Torres NTMP Improvements
Results
$200,000 to $300,000 est. value
El Paso, TX

Wainwright and North East Basin Park Improvements - Capital Improvement
Results
$625,000 to $725,000 est. value
El Paso, TX

Playa Drain Trail Phase II - Segment 2
Alteration
Results
El Paso, TX

Last Updated 07/09/2021 10:02 AM
Project Title

Playa Drain Trail Phase II - Capital Improvement

Physical Address View project details and contacts
City, State (County) El Paso, TX 79907   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000 to $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Playa Drain Trail Phase 2 Segment 1 project consists of construction of a new pedestrian trail, including trail amenities, providing ADA accessibility, and landscape and irrigation improvements. This project will be bid as a single Base Bid project. Base Bid consists of the construction of a new asphalt pedestrian trail with concrete ribbon curbs from Whittier Street to Elvin Way (Davis Drive). The project improvements include: erosion controls; traffic controls; accessible pedestrian ramps and improvements at Whittier Street, Prado Drive and Davis Drive and improvements to existing roadway curbs; roadway crosswalks, roadway, trail striping and signs; construction of trail monument columns, picnic tables, benches, and trash receptacles; plain and colored concrete walk paving, including fixed and collapsible bollards; landscape and irrigation improvements, which includes new water meters for the irrigation system. Access to all properties must be provided during construction.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents