Similar Projects
I-75 MLK DDI
Bidding
FL

East Selmon Expressway Slip Ramps Design-Build
Bidding
Tampa, FL

Design-Bid-Build Paving Indefinite Delivery Indefinite Quantity Single Award Construction Contract for the Naval Air Station Pensacola Florida Area of Responsibility
Post-Bid
$15,000 to $1,000,000 est. value
Pensacola, FL 32508

District Office Asphalt Repair and Installation at three Onsite Locations
Post-Bid
Coral Springs, FL

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

Inspection, Management and Performance of I-4, I-275, I-75, I-375, and I-4 Connector in Hillsborough and Pinellas Counties
Results
Less than $39,856,572 est. value

Public Works Minor Construction Projects with Costs less than $2,000,000.00
Bidding
Less than $15,000,000 est. value
FL

Ridge Road Phase 2A /Cr 524
New Construction
Post-Bid
New Port Richey, FL 32800

Resurfacing of CR-229S
Results
Macclenny, FL 32063

Asphalt Repair
Bidding
$273,000 est. value
FL

Resurfacing FY20, Increment 3
Post-Bid
Less than $3,367,468 est. value
Sarasota, FL 34230

FY 2020 Street Rehabilitation
Results
Less than $1,271,736 est. value
Pensacola, FL 32502

Unit 11 - PGA National Avenue of the Champions Milling and Resurfacing Project
Bidding
Palm Beach Gardens, FL 33418

District 3 Asphalt Paving 2020
Post-Bid
FL

Crawford Road Phase I
Results
Yulee, FL 32097

Last Updated 08/11/2020 12:06 PM
Project Title

Calhoun County FY 2018 CDBG Improvements

Physical Address View project details and contacts
City, State (County) FL   (Calhoun County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of 5 fire hydrants on CR 69 South, the resurfacing of Pitts Circle, and the paving of Vinson Road, Gaston Spivey Road, Lil Circle, Post Office Road, Miles Road, and Creel Lane, with possible additive alternates for additional roads.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents