Similar Projects
Remove Six Dam Structures (Design/Build Project)
Bidding
$5,000,000 to $20,000,000 est. value

Remove Six Dam Structures (Design/Build Project)
Bidding
$5,000,000 to $20,000,000 est. value

Central Business District Tunnel Lighting and Conduit Replacement
Post-Bid
Pittsburgh, PA 15222

FE Walter Dam, White Haven - PA, Inspection and Repair of Right Service Gate in Tower
Post-Bid
$250,000 to $1,000,000 est. value
White Haven, PA 18661

Capitol Complex - Central Plant Steam Tunnel Repairs
Results
Less than $1,800,000 est. value
Harrisburg, PA

Marquette Lake Dam - Improvements to Marquette Lake Dam
Results
Less than $8,500,000 est. value
Harrisburg, PA

20 Dam Repairs at Various Locations in Western and Central Pennsylvania
Renovation
Bidding
$1,000,000 est. value
Harrisburg, PA 17105

Repair of Lake Swiftwater Dam
Renovation
Post-Bid
Henryville, PA 18332

Dam Rehabilitation - Construction - Hibernia Dam, Chester, PA
Results
$500,000 to $1,000,000 est. value
PA 19320

Dam Repairs - Promised Land Dam
Bidding
$25,000 to $50,000 est. value
Greentown, PA

Capitol Complex Central Plant Steam Tunnel Repairs - General Construction
Post-Bid
$500,000 to $600,000 est. value
Harrisburg, PA 17100

Sand Springs Dam D52-177 Replacement of Outlet Vault and Valve
Results
PA

Construct Temporary Causeway Susquehanna River Inflatable Dam at Sunbury
Bidding
$100,000 to $500,000 est. value
Northumberland, PA

Meadow Grounds Lake Dam
Results
$2,000,000 to $5,000,000 est. value
McConnellsburg, PA

3-Year Maintenance Contract for Neshaminy Flood Control Dams
Term Contract
Results
PA

Last Updated 05/04/2020 08:03 AM
Project Title

Reservoir Tower Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Williamsport, PA 17701   (Lycoming County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the replacement stem guides, installation of secondary closure, gate valve repair and other associated items of work with the Reservoir Tower Rehabilitation at the John C. Youngman and Heller Dams.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents