Similar Projects
Existing Pre-K, Elementary, Middle and High Schools Renovations & Additions
Renovation, Addition - 27,100 SF
Conception
Cadet, MO 63630

New Elementary School
New Construction
Conception
Columbia, MO 65203

Multiple Construction Projects
Renovation
Design
$300,000 est. value
Oak Hill, MO

Engineering Works
Renovation
Design
Clarkton, MO

Proposed Building Addition for Milan Elementary School
Addition, Demolition, Infrastructure - 5,500 SF
Bidding
$1,100,000 CJ est. value
Milan, MO 63556

PS1 - Tornado Shelter & Classroom Addition to Primary School
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Rogersville, MO 65742

Fulton 58 School District-Secure Vestibule Upgrades
Renovation
Post-Bid
Fulton, MO 65251

Woodland Elementary School Phase II
Renovation
Post-Bid
Kansas City, MO 64106

McGrath Elementary School And ECC: Building Package (Phase 1)
New Construction
Results
Brentwood, MO 63144

McGrath ES and ECC Building Package (Phase 1)
New Construction
Results
$15,000,000 to $16,000,000 est. value
Brentwood, MO 63144

Ladue Old Bonhomme Elementary
Renovation
Construction
Saint Louis, MO 63132

Briarcliff Elementary
Renovation, Addition - 10,300 SF
Construction
Kansas City, MO 64116

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Holy Cross - Bright Futures Academy
Addition, Demolition, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Kansas City, MO 64123

New Elementary School
New Construction
Conception
Columbia, MO

Last Updated 12/12/2022 06:03 PM
Project Title

Alterations To: Monroe Elementary School - Phase II

Physical Address View project details and contacts
City, State (County) Saint Charles, MO 63301   (Saint Charles County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,343,060 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For project related questions, please contact Dickinson Hussman Architects (Stan Hampton) at (email at shampton@dharch.com). The owner reserves the right to reject any and all bids. Bidders must provide a Bid Bond in the amount of 5% of the proposed contract sum. The successful bidder will be required to provide 100% Performance and Payment Bonds, comply with the Missouri Department of Labour Standards Prevailing Wage Rates, and be enrolled in the E-Verify Federal Work Authorization Program. The scope of the project is to furnish, install, commission and place into operation an H.V.A.C. system that meets the intent of the design and the goals of the owner and users as outlined in the bid documents. Additionally, existing HVAC systems shall be modified as detailed on the bid documents. *As of November 23, 2022, addendum 2 has been issued.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents