Similar Projects
Krishna Complex Hotels - La Quinta Inn - Phase 2
New Construction
Conception
American Fork, UT 84003

South Cairns Development
New Construction
Design
Sandy, UT 84070

Lakeview Business Park
New Construction
Design
$1,500,000,000 est. value
Tooele, UT 84074

Comfort Inn & Suites
New Construction - 66,644 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Bryce Canyon, UT

Delta by Marriott
New Construction - 140,000 SF
Post-Bid
$20,000,000 to $25,000,000 est. value
Saint George, UT 84770

Holiday Inn Express
New Construction - 45,229 SF
Construction
Nephi, UT 84648

Black Desert Resort
New Construction
Construction
Ivins, UT

Holladay Hills Block L
New Construction - 2,678,000 SF
Pending Verification
$10,000,000 CJ est. value
Holladay, UT 84117

Richardson Flat Mixed-Use
New Construction - 104,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Park City, UT 84060

Country Inn & Suites
New Construction
Design
Kanab, UT 84741

Union Pacific Hotel
New Construction - 135,323 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT 84101

The Ascent - Park City
New Construction
Construction
$5,000,000 to $10,000,000 CJ est. value
Park City, UT 84098

Club Med Hotel
New Construction
Pending Verification
Huntsville, UT 84317

Wingate by Windam
New Construction - 53,559 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Draper, UT 84020

Tech Ridge
New Construction - 1,512,000 SF
Pending Verification
$10,000,000 CJ est. value
Saint George, UT 84770

Last Updated 06/17/2022 11:19 AM
Project Title

Deer Valley Resort Renovations

Physical Address View project details and contacts
City, State (County) Park City, UT 84060   (Summit County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $14,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a mixed-use development in Park City, Utah. Design plans call for the renovation of a 100,000-square-foot hospitality development. Plans call for the renovation of a resort lodge with retail, restaurants, and a coffee shop. As of June 16, 2022, this project is in the early planning stages. The project has been submitted into the Park City Planning Department and is currently under review. The owner is in the process of completing a traffic study which is not expected to be completed until late 2022. No building permits have been submitted. An architect has been selected; however, information regarding the general contractor has not been disclosed. A firm timeline has not been announced; however, construction is unlikely to begin prior to summer 2023 at the earliest.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Hotel/Motel, 100,000 SF Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents