Similar Projects
Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Hall Boulevard / Pfaffle Street New Traffic Signal - City Of Tigard
Infrastructure
Conception
$950,000 CJ est. value
Tigard, OR 97223

RFQ Contractor - McKinley Seismic /Roof General Contractor Upgrades
Renovation
Design
$3,700,000 CJ est. value
Beaverton, OR 97006

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

HiLight FTTP Construction Shute Park Phase 3 - Public Improvement ITB
Infrastructure
Bidding
$308,000 CJ est. value
Hillsboro, OR 97123

Starbucks- Peterkort Towne Square / Beaverton
Demolition, New Construction, Infrastructure - 4,250 SF
Bidding
$1,300,000 CJ est. value
Portland, OR 97225

Southwest Division Street Culvert Replacement Project
Infrastructure
Post-Bid
$840,000 CJ est. value
Aloha, OR 97007

Cornelius Pass Road Pipeline Project - Willamette Water Supply
Infrastructure
Post-Bid
$4,507,318 CJ est. value
Hillsboro, OR 97123

Vose Elementary Classroom Addition
Renovation, Addition, Alteration - 9,850 SF
Results
Beaverton, OR 97008

Hawksview Elementary School Additional Casework
Renovation
Results
$300,000 est. value
Sherwood, OR 97140

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Cedarbrook of Tigard Senior Living
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Portland, OR 97223

Pacific Highway Street Lights - 95065 - City Of Tigard
Infrastructure
Conception
$672,000 CJ est. value
Tigard, OR 97223

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

JWC Minter Bridge 24-inch Valve Replacement JWC STL 30-inch Valve Replacement(s)
Infrastructure
Bidding
$300,000 CJ est. value
Hillsboro, OR 97123

Last Updated 12/13/2022 08:38 AM
Project Title

RFQ Design - 2019 Capital Construction Bond - New Primary School at Frog Pond Project

Physical Address View project details and contacts
City, State (County) Tualatin, OR 97062   (Washington County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $32,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The West Linn-Wilsonville School District (District) is requesting statement of qualification proposals from qualified firms interested in being included on a list of qualified eligible contractors to bid on the New Primary School at Frog Pond Project. The scope of this project includes a starter primary school on a green field site for up to 350 students. Project construction budget is $32 million. Project construction schedule expected to be 20 months. Proposals will be subjected to an internal committee review and evaluation process. Brevity and clarity are appreciated. Top-rated candidates may be invited to an informal interview. Firms that achieve the requisite score shall be included on a list of vendors eligible to the District. Those firms will then be invited to participate in a low bid procurement process. The schedule for the low bid process is included in the RFP document. Inclusion on the list of eligible vendors does not guarantee award of contracts. The District reserves the right to: (1) reject any or all proposals; (2) waive any informalities or irregularities; (3) negotiate final contracts that are in the best interest of the District; (4) select firms which appear to be in the best interest of the District. A copy of the Request for Proposals (RFP) document is available upon request from the District Representative indicated below. Any addenda will be sent to interested parties from the same District Representative no later than the date specified in the RFP, it is the proposing firm's sole responsibility to receive and acknowledge addenda. Amy Berger bergera@wlwv.k12.or.us 503-673-7977. The method of contractor selection has not been determined at this time.

Details

1 Story Above Grade, 58,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents