Similar Projects
Energy Recovery Flight-Type Dishwasher and Installation
Post-Bid
Denver, CO

CCTV
Post-Bid
Fort Carson, CO

Building Support Equipment Services
Results
CO

Compost Trommel Screen
Results
Less than $200,000 est. value
Grand Junction, CO 81503

Combi Oven
Post-Bid
Canon City, Parkdale, CO 81212

RC Lockridge Ceiling Lifts
Results
Less than $320,000 est. value
Golden, CO 80401

Avigilon Ip Cameras/Software
Post-Bid
Castle Rock, CO

Whitlock Wtp Inlet Hydroelectric Water Turbine Package
Results
Pueblo, CO 81003

Single Rack Gas Oven, Industrial And Food Curing Cabinet
Post-Bid
Colorado Springs, CO

Jeffconet Electronics
Results
Golden, CO 80401

Welding Equipment
Post-Bid
Pueblo, CO

Weather Station Equipment
Results
Glenwood Springs, CO

Guardrail Grader Attachment
Post-Bid
Denver, CO 80204

Pueblo Water - Drilling and Tapping Machine
Results
Pueblo, CO 81003

Asphalt Hot Boxes
Post-Bid
Denver, CO 80204

Reported 08/22/2020 12:00 AM
Project Title

Nutrition Services Refrigeration

Physical Address View project details and contacts
City, State (County) CO   (Arapahoe County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide labor and materials for preventative maintenance in accordance with the manufacturers recommendations, for all refrigeration equipment owned by the Nutrition Services Department of Aurora Public Schools (APS). Preventative Maintenance (PM) is a systematic approach and is based upon schedules of inspection and replacement that reflect the requirements of each piece of equipment. Provide labor and materials for planned preventative maintenance for all District-owned refrigeration equipment. Preventative maintenance includes, but is not limited to, the following: a.Inspect all electrical, manual, and mechanical components. b.Inspect all sealed systems for leaks. c.Clean all dirt and debris from filters, fans, fins and grates. d.Lubricate all required joints, bearings, gas valves and fittings. e.Thoroughly test all equipment for proper operation. f.Suggest further repairs needed to maintain Original Equipment Manufacturer (O.E.M.) specifications and safety on all equipment.

Details

Division 11 - Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents