Similar Projects
Tennant Trailhead
Renovation
Design
$400,000 est. value
WA

Joc King County
Renovation
Design
$6,000,000 est. value
WA

Chestnut Ridge Park Renovation
Renovation
Bidding
$450,000 to $500,000 est. value
Kent, WA 98031

Lake to Sound Trail - Segment C SeaTac - REBID
Renovation
Post-Bid
$560,206,646 est. value
Sea-Tac, SeaTac, WA

Engineering Services for 2021 Green to Cedar Rivers Trail Project
Infrastructure
Post-Bid
$400,000 est. value
Seattle, WA

2021-2022 Master Planning: Beaton Hill Park And Big Rock Park South
New Construction, Infrastructure
Results
$275,000 est. value
Sammamish, WA 98074

Des Moines Sound View Park Project
Renovation
Results
Des Moines, WA 98198

Tennant Trailhead
Renovation
Design
$1,400,000 est. value
WA

Squire`s Landing (Park Waterfront & Natural Open Space Access Project)
Renovation
Post-Bid
Kenmore, WA 98155

Lake City Land Banked Site Park
Demolition, Infrastructure, Alteration
Results
Seattle, WA 98125

Rainbow Bend MRP
Renovation
Design
$3,000,000 est. value
WA

Skyway Park Improvements
Renovation
Results
Seattle, WA

Marymoor Gateway Trail
Renovation
Design
$900,000 est. value
WA

Lake To Sound Seg C Phase Two
Renovation
Design
$1,750,000 est. value
WA

Cougar Precipice
Renovation
Design
$1,200,000 est. value
WA

Last Updated 01/20/2022 02:42 PM
Project Title

Lake to Sound Trail - Segment C SeaTac

Physical Address View project details and contacts
City, State (County) Seattle, WA 98113   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for the improvement of a shared use path, which runs from S 200th Street in the City of SeaTac to 8th Avenue S/Des Moines Memorial Drive Intersection in the City of Burien. Work includes, but not limited to, construction of approximately 1.8 miles of 10- to 12 foot-wide paved trail with gravel shoulders, 800-feet of elevated boardwalk structure, curb and gutter, stormwater BMPs, stormwater conveyance system, culvert, soldier pile wall and structural earth wall, concrete driveway crossings, erosion control, site preparation, grading, traffic control, utility adjustments/relocation, roadway channelization striping, signal equipment relocation, and wetland mitigation planting.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents