Last Updated | 09/16/2022 09:34 AM |
Project Title | Mazonia-Braidwood State Fish and Wildlife Area |
Physical Address | View project details and contacts |
City, State (County) | Braceville, IL 60407 (Grundy County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,500,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Base Bid work provides for the construction of three (3) single-lane concrete boat launch ramps (one at Eagle Lake and two at Ponderosa lake). Each boat ramp assembly is to include a concrete walk approach, a 6 wide gangway and floating dock. One boat ramp at the Ponderosa Lake will be ADA accessible. The boat ramps will be provided with asphalt surface vehicle parking lots and maneuvering areas to back into the ramps. The scope also includes a 12-foot by 12-foot vault toilet and the construction of a 20-foot asphalt surface road from W 5000 N Road (start Sta. 10+00) to Ponderosa lake with a total length of 2,485 linear feet. Accessible Floating Kayak Launch System at Ponderosa Lake is Bid Alternate G1 and Asphalt Roadway to Kayak Launch Area at Eagle Lake is Bid Alternate G2. A. Prequalification. Bidders must be prequalified with CDB; allow 45 days for application processing. For an application and a copy of CDBs Standard Documents for Construction (applicable to this project), visit CDBs Website or phone 217/782-6152 (TDD 217/524-4449). B. MBE/WBE/PBE/VBE. MBE/WBE/PBE/VBE firms must be certified or registered with CMS as an MBE, WBE, PBE, or VBE prior to bidding. C. Prevailing Wage. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). D. Registration with the Illinois Procurement Gateway (IPG). Vendors may pre-register with the IPG and receive a vendor registration number. The IPG is a web based system that serves as the primary location for entering, organizing, and reviewing vendor information. The IPG allows prospective vendors to provide disclosures, registrations, and other documentation needed to do business with the State in advance of any particular procurement. Registration in the Illinois Procurement Gateway is optional. E. Certifications and Disclosures. Vendors must have an approved Illinois Procurement Gateway registration number and completed Form B, or submit the Standard Certifications and Disclosure Form(s) (Form A) with bid at time of submittal. Failure to provide a completed Form A standard certifications and financial disclosure or Form B, will result in rejection of bid. F. Subcontractors. You are also required to submit disclosure forms and standard certifications for subcontractors not considered incidental to the performance of the contract with an annual value over $50,000 within 20 days of execution of your contract with CDB or execution of the contract between you and your subcontractor, whichever is later. A valid IPG registration number can be provided in lieu of hard copies of the standard certifications and financial disclosure forms. (See D. above.) Subcontractors must receive an Authorization to Proceed prior to performance of any work. G. Supplement to SDC. Bidders are advised to review Article 01 11 01, Supplement to SDC, for any revisions to the Standard Documents for Construction. H. Progress Payments. Progress payments will normally be issued by the Illinois Comptroller within 30 business days after CDB receives and approves an Invoice-Voucher. I. Bid Protest. Bidder may submit a written protest to the Protest Review Office following the requirements of the Administrative Rules, 44 Ill. Adm. Code 8.2075. For protests related to specifications, the Protest Review Office must physically receive the protest no later than fourteen (14) days after solicitation or related addendum was posted to the Bulletin. For protest related to rejection of individual bids or awards, the protest must be received by close of business no later than fourteen (14) days after the protesting party knows or should have known of the facts giving rise to the protest. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |