Similar Projects
Jewelry Room Ventilation
Term Contract
Bidding
Herriman, UT 84096

HTW: Replace Expansion Tanks And Add Dearator
Term Contract
Bidding
$4,445,362 est. value
Salt Lake City, UT 84129

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

York OEM HVAC Parts and Equipment
Term Contract
Post-Bid
Salt Lake City, UT 84190

Commercial HVAC and Building Controls
Term Contract
Results
Salt Lake City, UT 84114

Chiller Replacement
Results
West Jordan, UT 84081

SLCO ADC AHU Replacement
Term Contract
Bidding
$900,000 to $950,000 est. value
South Salt Lake, UT 84119

Salt Lake County Automatic Build DDC and HVAC Controls
Term Contract
Post-Bid
Salt Lake City, UT 84190

Procure and Install a Source Capture Exhaust System(S)
Results
Sandy, UT 84070

Commercial HVAC and Building Controls Pt.2
Term Contract
Post-Bid
Salt Lake City, UT 84114

Widtsoe DX Condenser and Air-Handler Replacement
Results
$400,000 est. value
Salt Lake City, UT 84112

H999--Test, Inspect and Certify Medical Air, Oxygen, Nitrus Oxide and Medical Vacuum Systems
Post-Bid
Salt Lake City, UT

DFCM Construction-Standard Low Bid-DWS Admin Building HVAC and Controls (Bas/Access)-Phase II
Results
$985,800 est. value
Salt Lake City, UT 84101

SLCC TRC CT Dust Collector
Post-Bid
Salt Lake City, UT 84130

Residential HVAC Services
Term Contract
Results
Salt Lake City, UT 84114

Last Updated 06/23/2021 02:48 PM
Project Title

Chiller Replacement Jefferson Jr. High School

Physical Address View project details and contacts
City, State (County) Kearns, UT 84118   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The school’s cooling system is currently accomplished using 2 air cooled chiller units. The existing chillers have reached the end of their life-cycle and are to be replaced. A brief overview of the scope of work is as follows:1. Demo and remove existing chillers and ancillary equipment as detailed in the plans and specifications. Please note, that demolition of the existing cooling system may not begin until the conclusion of the school year or June 4, 2021. 2. The air-cooled chillers are to be replaced by a water-cooled chiller and cooling tower. The new equipment will be installed in a 2-story concrete enclosure that will be constructed as part of this project. 3. Project Schedule – Since the existing cooling system must be maintained and online until June 4, 2021, the end of the current school year. The new cooling system must be online before August 15, 2021 the contractor will be required to schedule and manage construction activities to conform with the Dates of Construction.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents