Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Saylorville Shoreline Erosion Protection Project
Term Contract
Design
Johnston, IA 50131

McCloud Run East Floodwall Construction
Infrastructure
Bidding
$1,504,558 est. value
Cedar Rapids, IA 52402

Well 5 Reconfiguration
Infrastructure
Bidding
$129,300 est. value
Waverly, IA 50677

Fort Randall-Sioux City 230-Kv Transmission Line, Structure 103/4, Access Ramp and Tower Erosion Repair, IA
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Sioux City, IA

Wanatee Tributary Restoration
Infrastructure
Post-Bid
$147,000 est. value
Marion, IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management Project
Term Contract
Design
$10,000,000 est. value
Cedar Rapids, IA

Martha L. Miller Drive East Extension
Infrastructure
Bidding
Pleasant Hill, IA 50327

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

Last Updated 01/28/2022 09:54 AM
Project Title

Drainage District No. 1 and 2, East Main

Physical Address View project details and contacts
City, State (County) Klemme, IA 50449   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $147,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of construction of 50 stations of open ditch excavation, 50 stations of spoil bank leveling, 50 stations of open ditch seeding and fertilizing, clearing and grubbing, riprap placement, repairs to surface drainpipes and tile extension pipes, and all other miscellaneous items related thereto.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents