Similar Projects
Sidewalk and Parking Lot Repairs
Bidding
Charlestown, IN

Indy Access Curb, Sidewalk and Ramps
Infrastructure
Bidding
$400,000 to $450,000 est. value
Indianapolis, IN

Alexander Street Storm & Sanitary Sewer Installation
Post-Bid
Bremen, IN 46506

Water Meter Salvage
Post-Bid
Fort Wayne, IN 46802

ADA Improvements and Handicapped Push Button Entry System
Results
$122,408 est. value
Crown Point, IN 46307

Grace Street Storm Sewer Improvement
Results
Less than $565,000 est. value
Highland, IN 46322

Grand Army of the Republic Highway Trail
Infrastructure
Bidding
Kendallville, IN 46755

Recover Forward Sidewalk
Post-Bid
Bloomington, IN 47402

Bike and Pedestrian Facilities
Results
IN

Windy Oaks Subdivision – Storm Water Management System Improvements, Phase 2
Infrastructure
Bidding
Valparaiso, IN

Delaware Street and 46th Avenue Parallel Force Main
Post-Bid
Merrillville, IN 46410

Downtown Streetscape Revitalization
Results
Bremen, IN 46506

Schell Lane Sidewalk
Infrastructure
Bidding
New Albany, IN 47150

South Parking Lot and Entrance Lane Sealcoating
Post-Bid
Indianapolis, IN 46200

2020 CCMG Paving & Second Street Resurfacing & Sidewalks
Results
$421,951 est. value
Orleans, IN 47452

Reported 06/03/2021 12:00 AM
Project Title

Duke Energy Relocation Plans Phase 2 North

Physical Address View project details and contacts
City, State (County) Carmel, IN   (Hamilton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installing ±890 LF of underground duct for Duke Energy’s transmission line from 1st Street SW to a new riser pole north of 1st Street NW between 1st Avenue NW and Rangeline Road. This will include the full reconstruction of Veterans Way/ 1st Avenue NW and 1st Street NW east of 1st Avenue NW, as well as ±701 SYS mill and overlay. Also included in the project is the installation of ±762 LF of underground Duke Energy distribution facilities, as well as ±1,702 LF of proposed communication duct bank for attachers to the existing Duke Energy poles. The project will also consist of installing ±1,451 LF of varying size ductile iron water main, connections and fire hydrant assemblies, as well as ±183 LF of 10” sanitary sewer main.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents