Similar Projects
LA 49 / Williams Blvd Corridor Improvement
Infrastructure
Design
$5,000,000 to $7,500,000 est. value
Kenner, LA 70097

River Road Ped - Bike Trail
Infrastructure
Design
$250,000 est. value
Baton Rouge, LA 70820

Cut-Off Splash Pad and Walking Path
Infrastructure
Bidding
$565,000 est. value
New Orleans, LA 70131

Audubon Estates Subdivision Pecan Acres Sustainable Resettlement Program Nelson Lane Sidewalks 81. Subsurface Drainage
Infrastructure
Bidding
$889,800 est. value
New Roads, LA 70760

Parking Lot Improvements
Infrastructure
Post-Bid
Opelousas, LA 70570

Installation of Parking Lot and Driveway at St. Helena Arts and Technology Academy
Infrastructure
Post-Bid
Greensburg, LA 70441

Trail Tram Project for LDWF
Infrastructure
Results
Baton Rouge, LA

US 190 (Gause Blvd) Sidewalk Improvements
Infrastructure
Results
$500,000 to $1,000,000 est. value
Covington, LA 70433

Williams Ave Shared Use Path (Houma)
Infrastructure
Design
$100,000 to $250,000 est. value
Houma, LA 70364

Scott Veterans Memorial at the Rail
Infrastructure
Bidding
$500,000 est. value
Scott, LA

Construction of EV Shuttle Charging Station- Claiborne Parking Lot
New Construction, Infrastructure
Post-Bid
New Orleans, LA

Pedestrian Crosswalk ENH (NO PH 2)
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

LA 3234 University Avenue Sidewalks
Infrastructure
Design
$1,000,000 to $2,500,000 est. value
Hammond, LA 70401

Rotary Centennial Plaza
Infrastructure
Bidding
$370,000 est. value
LA

CPA Parking Lot Addition
Addition
Post-Bid
Ridgecrest, LA 71334

Reported 07/15/2022 09:14 AM
Project Title

Bayou Blue (LA 316) Sidewalks

Physical Address View project details and contacts
City, State (County) Houma, LA 70360   (Terrebonne County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a sidewalk / parking lot in Houma, Louisiana. Design plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. Type Improvement Sidewalks Length 0.47 miles Parish : Terrebonne Estimated Cost Range $100,000 to $250,000 As of July 14, 2022, the project is in Design status. Anticipated letting date is December 14, 2022. LADOT - Bayou Blue (LA 316) Sidewalks *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents