Similar Projects
BMW Parking Lot Expansion
Alteration
Design
Orland Park, IL 60467

174th Street, 66th Court and 173rd Place Roadway Improvements and Water Main Replacement
Infrastructure
Bidding
$625,000 est. value
Tinley Park, IL 60487

German Church Road Over Flag Creek
Infrastructure
Bidding
$828,000 est. value
Willow Springs, IL 60480

Terminal 5 Landside & Parking Improvements - BP 8 - TP 21 - Asphalt & Concrete Paving
Infrastructure, Alteration
Sub-Bidding
Chicago, IL 60666

2021 Summer Paving
Post-Bid
Buffalo Grove, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Smart Overlay, Class D Patching and ADA Improvement
Results
Brookfield, IL 60513

(6.2-Mile) Cleaning and Sealing Longitudinal Cracks in the Existing Concrete Pavement
Results
Chicago, IL 60007

2022 Pavement Crack Fill Program
Infrastructure
Bidding
$80,000 est. value
Tinley Park, IL

HMA Resurfurfacing
Post-Bid
IL

(1.74-Mile) Improvement
Results
Hillside, Westchester, IL 60162

2022 Alley Improvements
Infrastructure
Bidding
$529,000 est. value
Evanston, IL

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

Crack and Joint Sealing on PCC Pavement
Results
Barrington, Hoffman, Palatine, IL

Winchester Avenue Reconstruction Project
Infrastructure
Bidding
$2,000,000 est. value
Calumet Park, IL 60643

Last Updated 05/24/2022 01:09 AM
Project Title

Green Alley Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) River Forest, IL   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the reconstruction of three existing alleys at various locations in the Village of River Forest. The existing alleys consist of pavement surfaces of varying in thickness. This project includes the removal of the existing pavement and excavation for the proposed pavement and pervious paver cross section. A three-foot wide strip of pervious pavers will be placed along the middle of the alley with the adjacent sides to be reconstructed with concrete. The improvements will include a perforated underdrain along the centerline of each alley, as well as connection to the existing sewer system. The alleys are surrounded by residential properties on all sides

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents