Similar Projects
Last Updated | 05/24/2022 01:09 AM |
Project Title | Green Alley Improvements - Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | River Forest, IL (Cook County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consists of the reconstruction of three existing alleys at various locations in the Village of River Forest. The existing alleys consist of pavement surfaces of varying in thickness. This project includes the removal of the existing pavement and excavation for the proposed pavement and pervious paver cross section. A three-foot wide strip of pervious pavers will be placed along the middle of the alley with the adjacent sides to be reconstructed with concrete. The improvements will include a perforated underdrain along the centerline of each alley, as well as connection to the existing sewer system. The alleys are surrounded by residential properties on all sides |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |