Last Updated | 08/19/2022 09:37 AM |
Project Title | Avalon Boulvard Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Decatur, IL 62521 (Macon County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $695,000 [brand] Estimate |
Plans Available from | Plan Holders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Separate sealed bids for the AVALON BLVD RECON- STRUCTION project will be received at the offices of Chastain & Associates LLC, 5 N. Country Club Rd, Decatur, Illinois, 62521. The work includes: The removal and replacement of the concrete pavement along Avalon Blvd. from Forsyth Pkwy. to 170 ft south of Ventura Dr. This work will also include mountable curb replacement, replacement of multiple sidewalk ramps with ADA accessible ramps, a storm sewer inlet installation, and other items necessary for the completion of the work. Each bid must be accompanied by cash, a certified check, bank draft, or a bid bond, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of 5% of the bid. Such cash, checks or bid bonds will be returned to all except the three lowest bidders within three days after the opening of bids, and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted bidder have executed the contract, or, if no award has been made within 45 days after the date of opening of bids, upon demand of the bidder any time thereafter, so long as he/she had not been notified of the acceptance of his/her bid. The successful bidder will be required to furnish a satisfactory performance-payment bond in the full amount of the bid or proposal. No bid shall be withdrawn after the opening of bids without the consent of the said Owner for a period of 45 days after the scheduled time of closing bids. The general prevailing rate of wages in the locality for each craft or type of worker or mechanic needed to execute the contract or perform such work, also the general prevailing rate for legal holiday and overtime work, as ascertained by the public body or by the Department of Labor shall be paid for each craft or type of worker needed to execute the contract or to perform such work. A copy of the most recent Illinois Department of Labor Prevailing Wages for Macon County available at the time the Bid Documents were prepared is included therein. The said Village of Forsyth, Illinois reserves the right to reject any or all bids and waive any informalities in bidding. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |