Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Bennett Street Water Line Replacement - City of Cedar Hill
Infrastructure
Conception
$300,000 est. value
Cedar Hill, TX

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

McKinney Avenue Mixed-Use
New Construction, Infrastructure - 750,000 SF
Design
$200,000,000 CJ est. value
Dallas, TX 75201

RFQ Construction Manager at Risk - Recreation and Indoor Aquatic Centers
New Construction, Infrastructure - 80,000 SF
Bidding
$53,000,000 CJ est. value
Desoto, TX 75115

Three (3) Hoop House Greenhouses
Infrastructure
Bidding
$250,000 CJ est. value
Dallas, TX 75248

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Trinity Crossing Phase 6A Utility Improvements
Post-Bid
Mesquite, TX

Crockett Park Dog Park - Site Development
Results
$531,150 est. value
Dallas, TX

Elmwood Parkway Trail - Phase Three - Site Development
Results
$894,400 est. value
Dallas, TX

Irving Mall Site Work
Renovation - 767,000 SF
Construction
Irving, TX 75062

Salad and Go - Marsh & Walnut Hill / Dallas
New Construction, Infrastructure - 767 SF
Construction
$300,000 CJ est. value
Dallas, TX 75229

Kohls Sephora Renovation #748 / Amarillo
Demolition, Renovation, Infrastructure - 2,500 SF
Pending Verification
$300,000 CJ est. value
Amarillo, TX 79124

O'Reilly Auto Parts Store #29 / Dallas
New Construction, Infrastructure - 7,453 SF
Pending Verification
$1,500,000 CJ est. value
Dallas, TX 75227

Stonehill/Vineyard Water Line Connection - City of Cedar Hill
Infrastructure
Conception
Less than $500,000 est. value
Cedar Hill, TX 75104

Last Updated 08/12/2022 02:07 PM
Project Title

Schedule A: Water and Wastewater Main Replacements at Various Locations and Schedule B: Unserved Areas Water and Wastewater Main Improvements at Various Locations

Physical Address View project details and contacts
City, State (County) Dallas, TX 75201   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer - 07/08/22
Owner View project details and contacts
Architect View project details and contacts
Description

Submittals will not be accepted after the due date/time and hard copy submittals are not permissible. Schedule A: Water and Wastewater Main Replacements at Various Locations and Schedule B: Unserved Areas Water and Wastewater Main Improvements at Various Locations ,Vendors shall submit project related questions to Bonfire no later than 4:00 P.M. on Monday, July 25, 2022. Project Manager: Daniel Atambo, 214-948-4521 TEXAS WATER DEVELOPMENT BOARD INSTRUCTIONS TO BIDDERS 1. Contingent Award of Contract This contract is contingent upon release of funds from the Texas Water Development Board. Any contract(s) awarded under this Invitation for Bids is/are expected to be funded in part by a loan or loan with principal forgiveness from the Texas Water Development Board and a grant from the United States Environmental Protection Agency, U.S. EPA. Neither the State of Texas, the U.S. EPA, nor any of its departments, agencies, or employees, are or will be a party to this Invitation for Bids or any resulting contract. 2. Disadvantaged Business Enterprise Goals The Texas Water Development Board's (TWDB) Clean Water and Drinking Water State Revolving Fund programs receive federal funds from the U. S. Environmental Protection Agency (EPA). As a condition of federal grant awards, EPA regulations require that loan recipients make a "good faith effort" to award a fair share of work to Disadvantaged Business Enterprises (D B E) who are Minority Business Enterprises (MBE's), and Women-owned Business Enterprises (WBE's) whenever procuring construction, supplies, services and equipment. More information on DBE requirements is available in the Supplemental Contract Conditions section of this guidance No. 14. Disadvantaged Business Enterprises. The current fair share goals for the State of Texas are as follows: CATEGORY MBE WBE CONSTRUCTION 2.94% 8.72% EQUIPMEN 7.12% 5.39% SUPPLIE 9.68% 9.34% SERVICE 10.84% 5.72% 3. Davis-Bacon Wage Rate Requirements (a) Davis-Bacon prevailing wage requirements apply to the construction, alteration or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean Water State Revolving Fund (CWSRF) or a construction project financed, in whole or in part, from the Drinking Water State Revolving Fund (DWSRF). (b) The Davis-Bacon prevailing wage requirements apply to Contractors and Subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, alteration or repair (including painting) of a treatment works project under the CWSRF or a construction project under the DWSRF. (c) For prime contracts in excess of $100,000, Contractors and Subcontractors must also, under the provisions of the Contract Work Hours and Safety Standards Act, as amended, pay laborers and mechanics, including guards and watchmen, at least one and one-half times their regular rate of pay for all hours worked over 40 in a workweek. The Fair Labor Standards Act may also apply to Davis-Bacon covered contracts. (d) Any contracts in excess of $2,000 must include the provisions of the Davis-Bacon Wage Rate Requirements. If the Owner (sub-recipient) is a governmental entity such as a city or district, it must insert in full the contract clauses found in TWDB Guidance DB-0156, Appendix 1: Section 3, Section 4 if the contract exceeds $100,000, and Section 5. If the Owner (sub-recipient) is a non-governmental entity such as a water supply corporation or a private company, it must insert in full the contract clauses found in TWDB Guidance DB- 0156, Appendix 2: Section 3, Section 4 if the contract exceeds $100,000, and Section 5. The Owner (sub-recipient) must ensure all prime contracts require the same full text in any subcontracts. See TWDB Guidance DB-0156 for the text of the contract language that must be included. Additional information on Davis-Bacon Wage Rate Requirements and its applicability to this contract can be found in TWDB Guidance DB-0156. 4. American Iron and Steel Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of 33 U.S.C 1388 for Clean Water State Revolving Fund projects or Public Law 114-113, Consolidated Appropriations Act, 2016, or subsequent appropriations acts, for Drinking Water State Revolving Fund projects. The Contractor must complete the statement of understanding regarding this requirement, found in Supplemental Contract Conditions, Item No. 9. 5. Equal Employment Opportunity and Affirmative Action All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors--Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. 6. Debarment and Suspension Certification This contract is subject to the federal requirements of Subpart C of 2 CFR Part 180 and Part 1532 regarding Debarment and Suspension. The Contractor will comply with the assurances provided with the bid that leads to a contract. 7. Bid Guarantee Each bidder shall furnish a bid guarantee equivalent to five percent of the bid price (Water Code 17.183). If a bid bond is provided, the Contractor shall utilize a surety company which is authorized to do business in Texas in accordance with Surety Bonds and Related Instruments, Chapter 3503 of the Insurance Code.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents