Similar Projects
NCWRF and SCWRF Structural Assessments and Repairs
Renovation
Bidding
Columbus, GA 31904

Progressive Design-Build Services W.B. Casey WRRF Biosolids Facilities Upgrade
Renovation
Bidding
Less than $100,000,000 est. value
Jonesboro, GA 30238

Bioxide Odor and Corrosion Control
Term Contract
Post-Bid
Savannah, GA 31400

Membrane Replacement on Anaerobic Digester Covers Water Pollution Control Plant
Post-Bid
Milledgeville, GA

NOWRF and MOWRF Tertiary Filtration
Results
Athens, GA

Interstate Centre WWTF and LAS Expansion
Renovation, Addition
Results
Richmond Hill, GA 31324

Middle Oconee WRF Maintenance Building
New Construction
Construction
Less than $1,345,000 est. value
Athens, GA 30606

Wastewater Treatment Facility Improvements
Renovation
Bidding
Abbeville, GA

USDA Sewer System Improvements
Post-Bid
Thomaston, GA

Intrenchment Creek WRC Decommission and South River Wrc Primary Clarifiers Replacement
Results
Atlanta, GA 30303

South Primary Clarifier Rebuild Wastewater Treatment Plant - Labor Only
Renovation
Bidding
Milledgeville, GA

SCWRF Vent and Flare System
New Construction
Post-Bid
Columbus, GA 31901

Indian Creek WRF Copper Removal System
Results
Madison, GA 30650

Flat Creek WRF Clarifier Renovation
Renovation
Post-Bid
Gainesville, GA 30504

Water Reclamation Facility Improvements - Addition of 2 Clarifiers
Results
Less than $2,300,000 est. value
Hoschton, GA 30548

Reported 12/10/2021 12:00 AM
Project Title

Wolf Creek WPCP Upgrade to 0.80 MGD

Physical Address View project details and contacts
City, State (County) Gray, GA   (Jones County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $9,500,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: The project consists of, but is not limited to, the following major elements: Offeror agrees to furnish all materials and equipment and to perform all labor necessary to construct the improvements to the water pollution control plant as shown on the Drawings. More specifically, the work shall include, but not be limited to, a new headworks structure with a mechanical and manual bar screen, a new splitter box, a new field-erected treatment plant, rehabilitation of the existing field-erected treatment plant, new multi-stage centrifugal blowers, new positive displacement blowers, a new effluent structure with tertiary disc filters, ultraviolet disinfection, a Montana flume, a post-aeration blower, a plant pump station, rehabilitation of sludge feed pumps, chemical feed equipment, a new control building, conversion of existing control building to electrical building and SCADA. The work also includes demolition, clearing and grubbing, earthwork, site work, yard piping, stormwater piping, gravel road, erosion and sediment control measures, grassing, construction staking, mobilization/demobilization, bonds, insurance, delivery of materials, taxes, and all other appurtenances necessary for completion of the Work as shown in the drawings and as specified.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents