Similar Projects
Habitat for Humanity Homes
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Macon, GA 31201

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

SR 29 BU/US 441bu at Fishing Creek in Milledgeville
Demolition, New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Milledgeville, GA 31061

Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

Drainage Replacement and Improvements
Demolition, Infrastructure
Bidding
$300,000 CJ est. value
Milledgeville, GA 31061

Drainage Replacement and Improvements
Demolition, Infrastructure
Bidding
$300,000 CJ est. value
Milledgeville, GA 31061

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cassville-White Road and I-75 Water Main Relocation
Infrastructure
Results
GA

Chitwood Cove Road Water Relocation
Infrastructure
Results
$650,000 est. value
GA

New Mission Road Elementary School
New Construction, Infrastructure - 102,635 SF
Construction
$30,000,000 CJ est. value
Cartersville, GA 30120

Dogwood Plaza / Adairsville
New Construction, Infrastructure - 7,260 SF
Construction
$1,500,000 CJ est. value
Adairsville, GA 30103

Forsyth Street Convenience Store and Gas Station
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Macon, GA 31201

The Villas At Moseley Dixon
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Macon, GA 31220

Rocky Creek Sewer Lines and the Riverside Basin Sewer Project - Macon Water Authorit
Infrastructure
Conception
$28,000,000 CJ est. value
Macon, GA 31201

Last Updated 06/16/2023 11:31 PM
Project Title

2022 CDBG Rushton Mill Redevelopment Area Phase I

Physical Address View project details and contacts
City, State (County) Griffin, GA 30223   (Spalding County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,723,615 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 16, 2023 , this project has not yet been awarded. The project is expected to be awarded in mid to late July by the City of Griffin.** Installation of approximately 5,254 linear feet of 6-inch C900 PVC water main and related appurtenances. Also included in the project is the abandonment of 607 linear feet of 6" A/C water main and 3,705 linear feet of 2-inch galvanized water main. The project also includes sanitary sewer point repairs consisting of replacing 1,168 feet of 8-inch sanitary sewer main at 8 locations and the replacement of manholes. The project will be finalized with milling and overlaying the streets within the project area. The quantity of milling and overlay area is 13,303 square yards Question Deadline 05/24/2023 at 12:00 PM ET The time allowed for Substantial Completion is 180 days; final completion- 210 days Each Bid must be accompanied by a Bid Bond completed on the attached Bid Bond Form with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five (5%) of the total amount payable by the terms of the contract, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount Performance and Payment Bonds, each in an amount at least equal to 110 percent of the contract amount, and a Certification of Insurance will be required. A Certification of Insurance will be required from the low bidder prior to award of the Contract. MBE (19.5%), WBE (6.9%)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents