Similar Projects
Padmount Switchgear
Bidding
Farmington, NM 87401

Hot Line Maintenance
Post-Bid
Farmington, NM

Water Treatment Plant Emergency Generator
Post-Bid
Bloomfield, NM

Electrical Connectors
Term Contract
Results
Farmington, NM

Switches, Disconnects, Reclosers and Sectiontionalizer, and Padmount Switchgear
Results
Farmington, NM

NIIP Block 4, 6 and 7 Power Factor Corrections
Post-Bid
Farmington, NM

Wood Distribution Poles
Results
Farmington, NM

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

115KV Upgrade Hare to Dwight Arthur Substation
Results
Farmington, NM

Substation Batteries and Installation
Post-Bid
Aztec, NM 87410

Generator Step-Up Transformer for Bluffview
Results
Farmington, NM 87401

Solar Paneled Carports
Post-Bid
Farmington, NM

1000 KVA 3 Ph Padmount Distribution Transformer
Results
Aztec, NM

N--NIIP Block 4, 6 & 7 Power Factor Correct
Post-Bid
$1,000,000 to $5,000,000 est. value
NM

Concrete Vaults and Pads
Results
Less than $13,284 est. value
Aztec, NM

Last Updated 02/28/2019 12:41 PM
Project Title

San Juan County McGee Park Coliseum and Site Electrical Upgrades-Phase 3

Physical Address View project details and contacts
City, State (County) Farmington, NM   (San Juan County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents