Similar Projects
Last Updated | 12/07/2022 09:52 AM |
Project Title | 2023 Summer Roofing Replacement Projects |
Physical Address | View project details and contacts |
City, State (County) | Mesquite, TX 75149 (Dallas County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Deadline for Questions/Request for Interpretations from Offerors NOVEMBER 9 at 12:00pm To facilitate this requirement and for ease of record keeping and uniformity of required project badges, Owner has arranged for this background screening and drug testing to be coordinated through Field Control Analytics (FCA) formerly FCBackground, customer.support@fieldca.com, (833) 227-0637, or Melanie Laird, mzlaird@fieldca.com (214) 755.3882 or Michelle Welch, mwelch@fieldca.com, (469) 525- 3911. Subcontractor shall coordinate screening and testing of their employees prior to mobilizing the project. The estimated cost is $74.50 per person per twelve-month period. The cost for this background screening and drug testing shall be included within the bidder's bid proposal. Each subcontractor will also be charged a one-time $50.00 account setup fee. Addendum Issued with Responses to Offeror Questions/Request for Interpretations (if applicable) NOVEMBER 10, 2022 SCOPE OF WORK: The project consists of full to partial roof replacement which include the replacement of coping, metal flashings, vent stacks, all miscellaneous metal, raise equipment as necessary and can be completed during summer dates as set forth in this document. Proposer to provide one (1) digital copy and two (2) hard copies of the proposal in the bid package. The Project Sites: BID ITEM #1 - Poteet High School Low Slope Roof Replacement - Gymnasium 3300 Poteet Drive Mesquite, Texas 75150 BID ITEM #2 - Wilkinson Middle School Low Slope Replacement 2100 Crest Park Drive Mesquite, Texas 75149 BID ITEM #3 - Shaw Elementary School Low Slope Replacement 707 Purple Sage Road Mesquite, Texas 75149 BID ITEM #4 - Agnew Middle School Low Slope Replacement 729 Wilkinson Drive Mesquite, Texas 75149 BID ITEM #5 - Berry Middle School Low Slope Roof Replacement 2675 Bear Drive Mesquite, Texas 75149 BID ITEM #6 - Food and Nutrition Building Low Slope Roof Replacement 405 East Davis Street Mesquite, Texas 75149 The Work will be awarded to multiple contractors. Continuing November 2nd if necessary, as determined after final walk on the November 1st. walks will begin at 7:30 and then moving to the next list of campus as determined while on site. In the event of inclement weather, the pre-proposal meeting will be held at the Facilities Management 2nd Floor Conference Room located in the MISD Service Center at 800 E. Kearney Street, Mesquite, Texas 75149. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |