Similar Projects
The Village At White Pine
New Construction
Conception
Anderson, SC

New Riverside Park / Barn Site - 00085 - Town of Bluffton
Infrastructure
Conception
$3,872,112 CJ est. value
Bluffton, SC 29909

Spencer's Trail
New Construction
Design
Anderson, SC

Spencer's Trail
New Construction
Design
Anderson, SC

Gravel Parking Lot and Challenge Course at Law Enforcement Center
Infrastructure, Renovation
Bidding
$450,000 CJ est. value
Bluffton, SC 29910

Town of Monetta - Elevated Storage Tank
Infrastructure
Bidding
$2,000,000 CJ est. value
Monetta, SC 29105

Nowell Creek Multi-Residential GMP
New Construction, Infrastructure - 431,273 SF
Sub-Bidding
$65,000,000 CJ est. value
Charleston, SC 29492

Pavement Markings - District 6
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Beaufort, SC 29902

Sitework Package for Highland Springs Elementary/Middle School - Phase 1
Infrastructure
Post-Bid
North Augusta, SC 29841

Site and Dwelling Unit Improvements at Existing Individual Site
Renovation
Post-Bid
$3,000,000 est. value
Belton, Blacksburg, Calhoun Falls, Central, Chesnee, Clover, Cowpens, Edgefield, Fountain Inn, Inman, Iva, Johnston, Landrum, Laurens, McCormick, Ninety Six, Pacolet, Pendleton, Prosperity, Saluda, Seneca, Trenton, Walhalla, Westminster, Whitmire, Williamston, York, SC

Development of Village Hills Subdivision
Results
Pendleton, SC 29670

Area 1 Detention Pond Clearing Project
Infrastructure
Results
SC

New Riverside Village - Phase 1
New Construction
Construction
Bluffton, SC

Pine Court Apartments
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
Beaufort, SC 29902

St. Andrews Mixed Use Development
New Construction, Infrastructure - 11,400 SF
Pending Verification
$25,000,000 CJ est. value
Charleston, SC 29407

Last Updated 10/14/2022 03:09 PM
Project Title

Porter Ridge Subdivision

Physical Address View project details and contacts
City, State (County) Elgin, SC 29078   (Kershaw County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 199-lot single-family residential development. As of October 10, 2022, the homebuilder has submitted a major subdivision development sketch plan application and it is in approvals. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents