Similar Projects
24 Hour Fuel Service Kiosk
Post-Bid
Apison, TN 37302

Natural Gas Mains
Term Contract
Post-Bid
Smyrna, TN

Gas and Sewer Relocations
Results
$300,000 to $425,000 est. value
Pulaski, TN

Replace Gas Line at Franklin High School
Infrastructure
Results
Franklin, TN 37064

Sodium Hypochlorite Disinfection System for Wastewater Treatment Plant
Results
Loudon, TN 37774

Installation-Automatic Read Water and Gas Meter System
Infrastructure
Post-Bid
Pulaski, TN

North College Street Gas Line Replacement
Post-Bid
$55,000 est. value
Mount Pleasant, TN 38474

2021 US 231N Natural Gas Line Extension
Post-Bid
TN

Repairs on Fuel Dispensing Pumps and Fuel Systems
Infrastructure
Bidding
Memphis, TN

Fuel Pump Replacement
Infrastructure
Post-Bid
Greeneville, TN 37743

Fuel Management System Upgrade Base System with Cellular Plan
Post-Bid
Livingston, TN 38570

Self-Fueling System Replacement
Infrastructure
Post-Bid
Greeneville, TN 37745

Natural Gas System Expansion
Infrastructure
Post-Bid
Waverly, TN

Reported 08/06/2021 12:00 AM
Project Title

Natural Gas Line Relocation

Physical Address View project details and contacts
City, State (County) Waverly, TN 37185   (Humphreys County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 07/14/21
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes Natural Gas Line Relocation on Bakerville Road Over Duck River. Work is to construct approximately 2500 LF of 8 high pressure steel natural gas transmission line and other appurtenances. Work consist generally of, but shall not be limited to, the following items: erosion control, traffic control, construction of natural gas transmission line and fittings, testing, coordination with the Owner, property owners, and other contractors on site, purging and removal or retirement of existing lines as indicated in the drawings, surveying, layout, finish grading, respreading topsoil, and site cleanup. Project shall also include all costs of clearing rights-of-way and easements and for boring/horizontal directional drilling under the Duck River as required to construct the natural gas pipeline.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents