Reported | 08/06/2021 12:00 AM |
Project Title | Natural Gas Line Relocation |
Physical Address | View project details and contacts |
City, State (County) | Waverly, TN 37185 (Humphreys County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer - 07/14/21 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work includes Natural Gas Line Relocation on Bakerville Road Over Duck River. Work is to construct approximately 2500 LF of 8 high pressure steel natural gas transmission line and other appurtenances. Work consist generally of, but shall not be limited to, the following items: erosion control, traffic control, construction of natural gas transmission line and fittings, testing, coordination with the Owner, property owners, and other contractors on site, purging and removal or retirement of existing lines as indicated in the drawings, surveying, layout, finish grading, respreading topsoil, and site cleanup. Project shall also include all costs of clearing rights-of-way and easements and for boring/horizontal directional drilling under the Duck River as required to construct the natural gas pipeline. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |