Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

UPS Valve Regulated Lead Acid Batteries, 12V, 7.0Ah
Post-Bid
Charlottesville, VA

MCAWRRF Lighting Improvements
Post-Bid
Charlottesville, VA

Generator Preventive Maintenance at Cold Springs Correctional Unit 10 and Cold Springs Men's CCAP
Demolition, Term Contract
Results
Charlottesville, Greenville, VA 24440

Data Center Switching
Term Contract
Results
VA

Underground Utility Locating Services
Term Contract, Infrastructure
Post-Bid
Charlottesville, VA

City Building Garage Lighting
Results
Charlottesville, VA 22901

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Generator Installation - Murray High School and Jouett Middle School
Results
$200,000 to $284,000 est. value
Charlottesville, VA 22903

Data Center UPS Refresh/Replacement
Term Contract
Post-Bid
VA

Preston-Morris - Electrical Service Panelboard Replacement
Results
$200,000 to $299,999 est. value
Charlottesville, VA

Solar Panel Installation
Alteration
Post-Bid
Scottsville, VA 24590

Cast Aluminum LED Halo Lit Signage and Installation - New River Community College
Results
Dublin, VA 24084

Installation and Maintenance of Solar Panels on Metrobus Shelters
Alteration
Post-Bid

Henley Solar Photovoltaic Inverter Replacement and Temporary Panel Relocation
Alteration
Results
$35,000 to $50,000 est. value
Crozet, VA 22932

Reported 02/04/2022 12:00 AM
Project Title

MCAWRRF Electrical Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) VA   (Albemarle County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Includes all work associated with the replacement of existing motor control centers (MCC) and transformers, installation of new 5kV cable, installation of new electrical ductbank, installation of a new switchgear, associated instrumentation and control improvements, and related site work.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents