Similar Projects
USP Canaan - Replace Powerhouse Boiler #1
Design
$250,000 to $500,000 est. value
Waymart, PA 18472

T.M. Peirce New Elementary School - Mechanical
Alteration
Bidding
$4,388,967 est. value
Philadelphia, PA 19132

Carbon County Emergency Operations and Training Center - HVAC and Mechanical Construction
Alteration
Bidding
Nesquehoning, PA 18240

Energy Plant/Power Substation Roof Replacement - (Mechanical)
Post-Bid
West Mifflin, PA 15122

(Mechanical) Building 478 (Hanger 1) And Building 479 (Hanger 2) Upgrade Project
Post-Bid
Pittsburgh, PA 15231

WWTP Effluent Filter Replacement - Mechanical Construction
Results
$200,000 est. value
York, PA 17402

CCM Coordinate Measuring Machine & Install
Results
Tobyhanna, PA 18466

Sand Spring Wastewater Treatment Plant Upgrades- General/Process Mechanical
Construction
Less than $3,000,000 est. value
Schnecksville, PA 18078

High School Athletic Improvements - Mechanical Construction
Alteration
Bidding
Claysburg, PA 16625

J041--Chiller Maintenance Philadelphia VAMC
Post-Bid
Philadelphia, PA

WWTP Improvements - Mechanical Construction
Results
$80,000 to $100,000 est. value
Bloomsburg, Lime Ridge, PA 17815

Gym HVAC Upgrade and Cooling Tower Replacement at Tohickon Middle School - Mechanical Construction
Alteration
Bidding
Doylestown, PA 18902

Pittsburgh International Airport PCA System Upgrade Project Phase 1 - Mechanical
Post-Bid
Pittsburgh, PA 15219

Office Building - Mechanical
Results
Lafayette Hill, PA 19444

Lairdsville Sanitary Sewer Project - General/Mechanical Contract
Infrastructure, Alteration
Bidding
Lairdsville, PA

Last Updated 07/26/2021 09:19 AM
Project Title

69th Street Transportation Center MFL Canopy Roof and HVAC Replacement - Mechanical Construction

Physical Address View project details and contacts
City, State (County) Upper Darby, PA   (Delaware County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is a three-prime project. 69th st terminal hvac & mfl gc the scope of work includes the construction related services while the mfl platform canopies are brought to a state of good repair inclusive of the following: the replacement of the existing roofing system, repair of damaged deck, repainting of the structure and installation of a permanent fall protection system. The scope of work also includes the 69th st terminal hvac improvements are made, inclusive of the following: installation of mini split air conditioning units in west terminal, replacement of air handling units in mezzanine area, removal of existing steam boilers and associated accessories in terminal basement, replacement of existing hot and chilled water pumps in terminal basement, replacement of existing hvac units on main terminal roof and replacement existing hydronic unit heaters in mfl terminal.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents