Similar Projects
(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 est. value
Kingman, AZ

Beale Street Streetscape and Improvements project
Infrastructure
Bidding
$7,000,000 est. value
Kingman, AZ 86401

Topock - Kingman Highway (I 40) (Ca Border - Mp 2.54)
Infrastructure
Bidding
$3,000,000 est. value
Kingman, AZ 86409

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

City-Wide Paving Project
Infrastructure
Post-Bid
Bullhead City, AZ 86442

Safety Improvements
Results
Less than $640,000 est. value
Kingman, AZ 86411

Fort Mohave Penetrate and Chip Seal
Results
$149,749 est. value
Kingman, AZ

Quartzsite - Parker - Topock Hwy (SR 95) (Riverside Dr - Bill Will. Rive)
Infrastructure
Bidding
$2,500,000 est. value
Lake Havasu City, AZ 86405

Apache Road Improvements South Phase
Results
Kingman, AZ

Dilkon Road Improvement
Infrastructure
Bidding
$2,000,000 est. value
Golden Valley, AZ 86413

Apache Road Improvements North Phase
Results
Kingman, AZ 86413

Brooks Boulevard Millings
Results
Kingman, AZ

Shinarump Road Phase II
Results
Kingman, AZ

Kingman Industrial Park Roadway Improvements
Infrastructure
Results
Kingman, AZ

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Results
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Reported 06/22/2022 11:33 AM
Project Title

US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 2 - Arizona Department of Transportation (AZDOT)

Physical Address View project details and contacts
City, State (County) Kingman, AZ 86401   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $41,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of June 21, 2022, this project is in the planning phase. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents