Similar Projects
SR 25 (US 27) from N. of SR 540 to N. of Kokomo Road, Polk County
Infrastructure
Bidding
$24,701,555 est. value
Dundee, FL 33838

Milling and Resurfacing
Infrastructure
Bidding
$1,792,762 est. value
Lake Alfred, FL 33850

2021 Pavement Resurfacing Project
Post-Bid
Winter Haven, FL

Construction Services for Project Improvements (Phase 2)
Post-Bid
Lakeland, FL

Main Street Pathways from Interlachen Parkway to Longfellow Boulevard
Results
Lakeland, FL 33801

Avenue C, SW Complete Street Project
Results
$1,419,000 est. value
Winter Haven, FL 33880

Milling and Resurfacing
Infrastructure
Bidding
$2,020,167 est. value
FL

Cascades Phase 2 Improvements
Post-Bid
Haines City, FL

Railroad Crossing Asphalt Repairs
Results
Less than $46,461 est. value
Frostproof, FL 33843

RRR on SR-60 from North Fort Drum Wild life Entrance to West of CR512
Infrastructure
Bidding
$1,287,945 est. value
Lake Wales, FL 33853

Brentwood Phase 1 Improvements
Post-Bid
Haines City, FL

Street Resurfacing
Results
$100,890 est. value
Lake Alfred, FL 33850

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Lakeland Park Drive Connector (from Lakeland Park Drive to Carpenters Way)
Results
$5,727,945 est. value
Lakeland, FL 33809

2022 Pavement Resurfacing
Infrastructure
Post-Bid
Winter Haven, FL

Last Updated 07/01/2022 06:50 AM
Project Title

Intersection Improvements

Physical Address View project details and contacts
City, State (County) Winter Haven, FL 33888   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,413,605 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Road Name: SR 50 Limits: 16030000 Project(S): 44405015201 (*) Federal Aid No: N/a Project(S): 44405015202 Federal Aid No: N/a Total Roadway Length: 2.128 Miles Contract Days: 325 Total Bridge Length: 0.000 Miles Total Proposal Length: 2.128 Miles Contract Execution Days: Special Start Date: N/a Aquis/flexible Start Time: 120 days The Improvements Under This Contract Consist of widening, milling and resurfacing, overbuild,median improvements, signing and pavement markings, signalization and lighting along SR 555 (US 17) from South of SR 540 to North of SR 540 and along SR 540 from East of SR 555 (US 17) to West of 1st street in Polk County

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents