Similar Projects
Robert Road Improvements - City of Prescott Valley
Infrastructure
Conception
$500,000 CJ est. value
Prescott Valley, AZ 86314

Robert Road Improvements - City of Prescott Valley
Infrastructure
Conception
$500,000 CJ est. value
Prescott Valley, AZ 86314

Bell Rock Trail Water Storage Tank
New Construction, Infrastructure - 2,350 SF
Design
$2,000,000 CJ est. value
Sedona, AZ 86336

SundogTrunk Main, Phase C - City of Prescott
Infrastructure
Design
$8,210,957 CJ est. value
Prescott, AZ 86301

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Police Station Remodel Project
Renovation
Post-Bid
Sedona, AZ 86336

Mingus Avenue (8th Street to Main Street) Project
Results
Cottonwood, AZ

Glassford Hill Road Pavement Rejuvenation
Infrastructure
Results
$156,000 est. value
Prescott Valley, AZ 86315

Unisource Energy Services
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Cottonwood, AZ 86326

Unisource Energy Services
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Cottonwood, AZ 86326

San Cipriano Apartments
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Cottonwood, AZ 86326

East Cherry Street Warehouse
New Construction, Infrastructure - 12,600 SF
Pending Verification
$1,000,000 CJ est. value
Cottonwood, AZ 86326

Concession Stand - Posse Grounds Park - PR-01 - City of Sedona
New Construction, Infrastructure
Conception
$559,000 CJ est. value
Sedona, AZ 86336

Willow Creek Gravity Sewer - City of Prescott
Infrastructure
Design
$2,650,000 CJ est. value
Prescott, AZ 86303

Last Updated 03/14/2023 03:20 PM
Project Title

Fire Drill Ground Improvements - 17001 - City of Prescott

Physical Address View project details and contacts
City, State (County) Prescott, AZ 86303   (Yavapai County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Fire/Police Station, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $3,487,427 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of multiple year phased approach. Initially efforts will target drill ground design/space needs analysis, followed by all work related to drainage, demolition of the condemned training tower, underground water, gas, and other sub-grade items as identified through the design process. This subsequently will be followed by all surface improvements such as paving, curbs, and concrete pads. Finally efforts will be targeted towards construction of a new tower and purchase and placement of other props as identified through the design process. As of March 14, 2023, design is underway. A schedule for bidding has not been determined. A firm construction timeline has not been released.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents