Similar Projects
SC State House-Refinish Marble Floors
Bidding
$450,000 to $550,000 est. value
Columbia, SC 29201

Flooring Renovation
Bidding
Less than $20,000 est. value
Cope, SC

Flooring Installation on Unit Prices Services
Post-Bid
SC

Cheraw Community Center Floor Repairs
Post-Bid
$600,000 to $800,000 est. value
Cheraw, SC 29520

Turn-Key Carpet Tile Replacement
Results
Columbia, SC

VCT Flooring at the Law Enforcement Center
Results
Gaffney, SC 29340

Kitchen Floor Project - Sue Cleveland Elementary School
Bidding
Piedmont, SC 29673

2019 Scrubbing, Sanding, Striping and Coating of Gymnasium Floors
Post-Bid
SC

Carpet and Flooring Products and Installation Term Contract (On Call)
Term Contract
Results
SC

Gym Floor Refinishing and Repainting
Bidding
Columbia, SC 29212

Hartsville Memorial Library Flooring
Post-Bid
Hartsville, SC 29550

Flooring Project at Tyger River Campus
Results
Duncan, SC 29334

Material Recycling Facility Tipping Floor Repair
Post-Bid
Conway, SC

Cabin Restroom Floor Repair
Results
Marietta, SC 29661

James Island Recreation Center Sport Court Flooring
Post-Bid
Charleston, SC 29401

Reported 04/05/2019 12:00 AM
Project Title

Fire Department Re-Tile Bay Floor

Physical Address View project details and contacts
City, State (County) West Columbia, SC 29169   (Lexington County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replace the quarry tile floor in the apparatus bays at the fire department. The work is to be done at the West Columbia Fire Department, located at 610 N. 12th Street, West Columbia, SC 29169. The work shall be done while still allowing the fire department to utilize a minimum of two (2) bays while work is being performed, as this is the only fire station the city operates. The work will consist of removing existing quarry tile flooring in the current bays, including the grout bed. Special attention shall be paid to properly preparing the concrete floor for the application of the new quarry tile and grout bed in accordance with manufacturer recommendations and industry standards. All tile shall be installed on a crack suppression membrane underlayment and aligned in a grid pattern. Align all joints with the base. Include expansion joints at 20-foot (minimum) intervals and at the perimeter walls.
Details
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents