Similar Projects
Trek Thru Truth - Christian Discovery Museum
New Construction, Infrastructure - 75,000 SF
Design
$20,000,000 CJ est. value
Cleveland, TN 37311

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Site Preparation/Excavation
Post-Bid
Cleveland, TN 37311

20Th Street/Foster Lane Site Development
Alteration
Post-Bid
Cleveland, TN

Construction of the HDPE Pipe Replacement Project Phase 1
Infrastructure
Results
$300,000 est. value
Cleveland, TN

SK Food Group Production Facility
New Construction, Infrastructure - 525,000 SF
Pending Verification
$205,200,000 CJ est. value
Cleveland, TN 37311

Spring Branch Water Main Extension
Infrastructure
Post-Bid
Cleveland, TN

Harris Creekroad SW and Tillie Road NE Waterline Extensions
Infrastructure
Post-Bid
Cleveland, TN 37312

Belleview Drive, South East Waterline Extension
Infrastructure
Post-Bid
Cleveland, TN 37323

Durkee Road Sanitary Sewer Extension
Infrastructure
Post-Bid
$184,000 CJ est. value
Cleveland, TN 37323

Davis Circle Water Main Replacement
Infrastructure
Post-Bid
Cleveland, TN

Georgetown Road Sewer Extension
Infrastructure
Post-Bid
$400,000 CJ est. value
Cleveland, TN 37312

RFQ Engineering - Sanitary Sewer System Preliminary Engineering
Infrastructure
Post-Bid
$2,800,000 CJ est. value
Cleveland, TN 37311

Lankford Drive NW Sanitary Sewer Extension
Infrastructure
Post-Bid
$230,000 CJ est. value
Cleveland, TN 37311

RFQ Engineering - Design and Construction Services Inspection of a Water System Improvements Project
Infrastructure
Post-Bid
$6,075,000 CJ est. value
Charleston, TN 37310

Last Updated 02/15/2023 01:39 PM
Project Title

Concrete Repairs, Concrete Grouting, Drainage Trench Installation and PVC Flushing Water Line Relocation at the Hiwassee River Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Charleston, TN 37310   (Bradley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Submissions Received, Selection Underway, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $110,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Any bid mailed shall be sent to Cleveland Utilities Water and Wastewater Division, ATTN: Jon Sparkman, P. O. Box 2730, Cleveland, TN 37320-2730. Any bid sent by Fedex or similar company shall be sent to Cleveland Utilities, Attention: Jon Sparkman, 2435 Guthrie Drive, N.W., Cleveland, TN, 37312. The Project consists of removing and replacing existing concrete slabs, installation of trench drains and PVC drain pipe, non-structural grout pumping to fill voids beneath a structure and relocation of approximately 75 feet of 2 PVC flushing water pipe. The allotted time for construction is to be 90 consecutive calendar days. Contractors are required to comply with TCA 62-6-119 as outlined in the Information to Bidders. No bid may be withdrawn within 45 days after the scheduled time for receipt of bids. All questions should be directed to Matt Bolt. Cleveland Utilities reserves the right to waive informalities and to reject any and all bids. It is the policy of Cleveland Utilities to ensure compliance with Title VI of the Civil Rights Act of 1964; 49 CFR, Part 21; related statutes and regulations to that end that no person shall be excluded from participation in or be denied benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance or any other funding source on the grounds of race, color, sex, national origin, or ancestry. By virtue of submitting a response to this solicitation, bidders agree to comply with the same non-discrimination policy.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction, Shoreline Protection.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents