Similar Projects
Morris Forman Water Quality Treatment Center - MEB Boiler Replacement
Alteration
Bidding
$700,000 to $1,200,000 est. value
Louisville, KY 40211

Boiler Replacement at Stuart Academy
Post-Bid
Louisville, KY 40272

Preventative Maintenance on all HVAC / Mechanical Systems at Michael O. Buchanon Park and Ephram White Park Gymnasiums
Post-Bid
Bowling Green, KY 42101

KICC Commonwealth Garage Elevator Upgrades
Results
Less than $311,896 est. value
Louisville, KY 40202

UK PAV A Central Sterile Sink
Addition
Results
$55,000 est. value
Lexington, KY

Harlan County HS Boiler Addition
Post-Bid
Baxter, KY 40806

Florence Government Center Commercial Boiler Replacement Project
Results
Florence, KY 41042

Cast Iron Condensing Boilers
Term Contract
Post-Bid
KY

Boiler Replacement at Newburg Middle School
Results
Louisville, KY 40218

Boiler Replacement at Kerrick Elementary School
Alteration
Post-Bid
Louisville, KY 40216

Boiler Replacement at Farmer Elementary School
Alteration
Results
Louisville, KY 40299

Carrollton Utilities - CU 2020 Gas Expansion
Infrastructure
Post-Bid
Carrollton, KY

PAV WH Floors 1-3 Replace Trace on Hot Water System
Alteration
Results
$165,000 est. value
Lexington, KY 40508

Odor and Corrosion Control Services
Alteration
Post-Bid
Fort Wright, KY

UKHC PAV H - Replace AHU S1 and S1A - BP-02 Trades - Trade Package 5 - Fire Suppression
New Construction, Infrastructure
Results
Lexington, KY 40508

Last Updated 05/17/2022 04:09 PM
Project Title

South Hall Hot Water Recirculation System

Physical Address View project details and contacts
City, State (County) Eastern, KY   (Floyd County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install a Hot Water recirculation system into the existing domestic hot water system for South Hall. South Hall consist of two wings, a four (4) floor South wing and a three (3) floor North wing. Tie into the main domestic hot water line at or near the end of each main run on every floor for both wings. Install isolation valves at the tie in point and balancing valve with flow meter. This would be the branch line for the recirculation system (total 7). Install a riser recirculation line up each wing to tie the branch lines into (2). Install the riser line back to the mechanical room on the first floor. Install a set of recirculation pump (parallel) as a primary and back-up into the feed water supply of to the two (2) instantaneous hot water heaters. Each pump requires individual isolation valves and local disconnect switches. After installation the system will be balanced and verified.

Details

Division 22 - Plumbing, Electric Domestic Water Heaters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents