Similar Projects
Repair Sidewalks / Install Pull-out Lane Project
Alteration
Design
$25,000 to $100,000 est. value
Tomah, WI 54660

2022 Concrete Restoration - Phase I
Infrastructure
Bidding
Madison, WI 53703

2022 Parking Lot Maintenance
Infrastructure
Bidding
Baldwin, WI 54002

Sidewalk and Curb Replacement
Post-Bid
$5,000 est. value
Winter, WI 54896

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

Parking Lot
Results
Milwaukee, WI 53205

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Construction
Fitchburg, WI 53711

C. Wisconsin Rapids, W. Jackson Street, W. Riverview Exp - Jackson Street Bridge
Infrastructure
Bidding
WI

Burnham Pointe Park
Post-Bid
Less than $231,532 est. value
West Allis, WI

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

West Military Road Railroad Crossing and Pedestrian Improvements
Infrastructure
Bidding
Rothschild, WI

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

East Lake Street Reconstruction
Results
Horicon, WI 53032

Health Care Center Sidewalk
Infrastructure
Bidding
Wyocena, WI 53969

Last Updated 03/21/2022 03:42 PM
Project Title

Trail Head Design - Phase 1

Physical Address View project details and contacts
City, State (County) Phelps, WI   (Vilas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1: Gravel Trail, Parking Lot, and Driveway Approximately 15,250 square feet of gravel parking lot, 360 lineal feet of gravel driveway, and 430 lineal feet of gravel ATV/Snowmobile trail construction including: clearing & grubbing, excavation common, rip-rap geotextile, base aggregate, aggregate surface, culvert pipe, signs, erosion and sedimentation controls, and turf restoration. To also include the fabrication/installation of an ATV/UTV loading dock.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents