Similar Projects
Port Freeport Harbor Improvement Project Reach #2, Bend Easing Mechanical Excavation In Brazoria County, Texas.
Term Contract
Design
$1,000,000 to $5,000,000 est. value
TX

Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Construction of Bulkheads for Texas Lake at Stephen F. Austin-Munson Historical Park
Infrastructure
Bidding
$60,000 est. value
Angleton, TX 77515

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Del Bello Lakes Section 8
Infrastructure
Bidding
TX

Piper Road Drainage Project
Post-Bid
Pearland, TX

CDBG-DR Drainage and Paving Improvements
Post-Bid
Holiday Lakes, TX

Freeport Harbor Levee Stabilization Wall Project
Results
Freeport, TX 77541

Manvel Town Center Public Detention Ponds Phase 1A and Manvel Town Center Public Utilities Phase 1A
Results
TX

Repair and Rehabilitation of the Caroline Tunnels for Harris County Precinct 2
Infrastructure
Post-Bid
Houston, TX

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Construction of Water, Sanitary, and Drainage Facilities Sierra Vista West Section 7
Infrastructure
Post-Bid
TX

Mimosa Acres Drainage Improvements
Results
Less than $1,047,830 est. value
Pearland, TX 77581

West Lea Subdivision Drainage Improvements
Infrastructure
Post-Bid
Pearland, TX

Construction of the Water, Sanitary Sewer, and Drainage Facilities to Serve Stewart Heights Section Fifteen
Results
TX

Canal System Restoration Project Site Group IV
Infrastructure
Post-Bid
$2,000,000 est. value
TX

Last Updated 03/18/2022 11:30 AM
Project Title

FY21 USACE Galveston District, FY21 Houston Ship Channel Oyster Mitigation, Harris County, Texas

Physical Address View project details and contacts
City, State (County) Houston, TX   (Brazoria County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule No. 1 Construction of three (3) oyster pads: 1) 2,060’ x 300’, 2) 2,531 x 300’, and 3) 1,888’ x 300’. Approximately 278,700 tons of cultch material will be required to construct the three pads. Water depths at placement site are less than – 10 MLLW. Contractor should be experienced working within Galveston Bay, Houston Ship Channel and surrounding area. Contractor should be experienced placing large quantity of select stone on bay bottom to construct pads. Option work includes: Extension of one (1) of the oyster pads an additional 174’ x 300’. Approximately 7,200 tons of cultch material will be required for the pad extension construction. Water depth is less than -10 MLL

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents