Similar Projects
Pavement Preservation and Repairs - Spring 2021
Bidding
Westport, CT

Hot-In-Place Asphalt Recycling
Bidding
Trumbull, CT

Brookfield Streetscape Center Island Removal
Post-Bid
$20,000 est. value
Brookfield, CT

Water Street Pavement Repair
Post-Bid
Bridgeport, CT 06610

Reconstruction of Pepper Street
Results
Monroe, CT 06468

Z--WEFA-Replace Driveway
Results
$25,000 to $100,000 est. value
Ridgefield, CT

Paving of Fire Station 3
Post-Bid
Trumbull, CT

Pequonnock River Trail Section A2
Results
Trumbull, CT 06611

2020 Road Resurfacing Program
Term Contract
Post-Bid
Darien, CT

Chip Sealing and Fog Sealing
Results
Shelton, CT

Implementation of a Pavement Management System for all Town Roads
Post-Bid
Fairfield, CT

Safety Improvements on Route 127 at Evers Street
Results
$2,500,000 to $4,999,999 est. value
Bridgeport, CT 06601

Black Rock Business Streetscape Improvement
Post-Bid
Bridgeport, CT

Bituminous Concrete Materials and Bridge Deck Membrane Waterproofing (Complete in Place)
Results

Pavement Management Program
Post-Bid
Norwalk, CT

Last Updated 11/24/2020 12:50 PM
Project Title

Cedar Heights Road Bridge (#04067) - Clearing and Grubbing/ Construction of Access Road

Physical Address View project details and contacts
City, State (County) Stamford, CT 06901   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Cedar Heights Road Bridge is located between Wire Mill Road and Rapids Road just south of the Merritt Parkway in North Stamford (see Location Plan). The existing bridge is scheduled to be replaced with work beginning in Spring/Summer 2021. Prior to bridge construction utility relocation work needs to be completed on the north side of the bridge to ensure utilities are not in conflict with future bridge construction. This project will consist of the construction of two (2) access roads (anti-tracking pads) and the clearing of trees, shrubs, etc. to facilitate utility relocation efforts by Eversource on the north side of the bridge. No grubbing will be required and trees, stumps, roots, etc. will be cut off to within 6” of the ground surface. Survey and stakeout of the easement/ROW lines will be performed in advance of construction (not in contract). Also, the exact location of the clearing limits and two construction access roads will be determined in the field prior to the start of construction. The approximate locations are shown on the attached plans. For bidding purposes assume 0.10 acres will be required to be cleared and that the construction access roads do not have to be removed at the end of construction. Silt fence should be provided as required and as ordered by Engineer during clearing operations.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents