Similar Projects
Tohono O'odham Nation - Integrated Fixed Tower (Ton Ift) Project Road And Site Preparation
Design
$10,000,000 to $25,000,000 est. value
Tucson, AZ 85746

Road Construction for the Pascua Yaqui Tribe PYT Tetakusim Improvement Project
Bidding
Tucson, AZ 85757

Pavement Rehabilitation
Bidding
Less than $21,640,000 est. value
AZ

Asphalt Cold Patching Materials; Upm, Aquapatch and Aquaphalt Bulk and Bagged
Post-Bid

Child Parent Centers Parking Lot
Renovation
Post-Bid
Tucson, AZ 85713

VA Tucson Resurface Roads
Results
$1,000,000 to $2,000,000 est. value
Tucson, AZ

Marana Main Street Roundabout
Results
Marana, AZ

Valencia East Extension
New Construction
Construction
$16,000,000 est. value
Tucson, AZ 85747

Los Portales Del Alamo Roadway Paving Project
Bidding
San Luis, AZ 85349

Gladden Farms Mike Etter Boulevard (North)
Post-Bid
Marana, AZ 85635

Gladden Farms Midfield Road - Phase 2
Results
Marana, AZ

Road Rehabilitation and Construction, for the Pascua Yaqui Tribe Los Reales Road Rehabilitation Project
Bidding
Tucson, AZ 85757

Coronado National Forest Roads Construction IDIQ
Results
$1,000,000 to $5,000,000 est. value
Tucson, AZ 85701

Construction of the Speedway Boulevard: Camino De Oeste to Painted Hills - Paved Shoulders Project
Bidding
$1,750,000 to $2,250,000 est. value
Tucson, AZ 85701

Pavement Raising and Under Seal Services
Results

Last Updated 01/02/2019 04:10 PM
Project Title

Shoulder Widening and Pavement Preservation

Physical Address View project details and contacts
City, State (County) Tucson, AZ   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $1,750,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description The project consists of adding 6` paved shoulders, concrete headers and rip rap as shown on the Houghton Road to I-10 Shoulder Widening Plans. Houghton Road between the City of Tucson Boundary south of I-10 and Andrada Road will also receive, crack seal, chip sealing surface treatment, and fog coat. Houghton Road will also receive a crack seal and fog coat from Anadrada Road to Sahuarita Road. The work includes traffic striping, traffic control, and miscellaneous work as needed.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents