Similar Projects
PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
Less than $5,368,000 est. value
Gurnee, IL

Clarifier Collection Systems - 18R01 - North Shore Water Reclamation District
Demolition, Alteration
Conception
$3,799,400 est. value
Gurnee, IL

Grand Avenue Water Main Improvements
Infrastructure
Bidding
$1,700,000 est. value
Northlake, IL 60164

Huber Drive Watermain Replacement
Infrastructure
Bidding
$700,000 est. value
Hillsboro, IL 62049

Vernon Hills West Pump Station Force Main Analysis for Lake County
Post-Bid
Waukegan, IL

Elizabeth Street and Appletree Court Water Main Improvements
Post-Bid
Yorkville, IL 60560

Lead Service Line Replacement
Results
Less than $4,000,000 est. value
Springfield, IL

Corrington Street Water Main
Results
Mascoutah, IL

3 New Fire Hydrants
Infrastructure
Bidding
$50,000 est. value
Coal Valley, IL

2021 On-Call Lead Water Service Line Replacement
Term Contract
Post-Bid
Joliet, IL

Hart Road and Main Street Water Main Replacement
Results
Less than $563,165 est. value
Barrington, IL

Colony Lane and Heritage Court Water Main Improvements
Infrastructure
Bidding
$70,000 est. value
Frankfort, IL 60423

Wickham Court Watermain Extension
Post-Bid
Green Oaks, IL 60048

Leslie Lane Watermain Improvements
Renovation
Results
Frankfort, IL 60423

75th Street Watermain Lining
Post-Bid
$100,000 est. value
Willowbrook, IL

Reported 06/28/2022 12:00 AM
Project Title

Advanced Metering Infrastructure Project with Ultrasonic Meters

Physical Address View project details and contacts
City, State (County) Iuka, IL   (Marion County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposal must include: 1 Kamstrup READy Manager Software License for 250 meter points 1 Kamstrup AMI RF Collector 1 READy Converter 200 Kamstrup FlowIQ 2250 Residential Water Meters 5/8" by 3/4" 25 External Antenna for Pit Mount (with a price included for each additional unit ordered beyond the base of 25 units) 100 Replacement Poly Lid ir'-12" (with a price included for each additional unit ordered beyond the base of 100 units)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents