Similar Projects
Bridge Building and Reconstruction
Term Contract
Post-Bid
TX

Bridge Creek Recreation Center Facility
Post-Bid
TX

Guardrail and Bridge Railing Repairs and Related Items at Various Locations
Results
TX

Park Road 22 Bridge Bond 2004 (Re-Bid)
Results
Less than $12,580,000 est. value
Corpus Christi, TX 78469

Twin Lakes Park Peninsula Bridge - Design and Construction Oversight
Post-Bid
Cedar Park, TX 78613

TX ERFO 215(1) Stubblefield Lake Road
Results
$2,000,000 to $4,000,000 est. value
New Waverly, TX 77358

Bridge Rail Repairs
Post-Bid
Houston, TX 77002

Wells Branch Mud Snake Bridge Replacement and Creek Project
Results
Austin, TX 78728

Bridge
Post-Bid
Gatesville, TX 76528

Road and Bridge Facility Improvements
Results
$2,400,000 est. value
Alvin, TX 77511

Bridge Lumber
Post-Bid
Nacogdoches, TX 75961

Clear Span Concrete Bridges and Concrete Box Culverts
Term Contract
Results
Greenville, TX 75401

Cullinan Park Pedestrian Bridges
Post-Bid
$250,000 est. value
Sugar Land, TX 77498

Birdville ISD Pedestrian Bridge and Parking
Results
$2,850,000 est. value
Haltom City, TX 76117

Repair of Bridge at Babe Zaharias Golf Course
Post-Bid
Port Arthur, TX 77642

Last Updated 11/10/2021 03:03 PM
Project Title

Jupiter Road Bridge Over Spring Creek - Rehabilitation

Physical Address View project details and contacts
City, State (County) Richardson, TX 75074   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $284,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Abutment backwall and wingwall replacement at southwest corner, providing cement stabilized abutment backwall and select backfill in approach roadway, bridge deck reconstruction at armor joint location, new armor joint and approach slab, abutting roadway and sidewalk repairs. channel repairs consists of the protection of the undermined concrete riprap at the southwest corner abutment. A gabion wall will be placed along the abutment toe for toe protection. The end protection will be extended through the west end of the abutment.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents