Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

East Hillsdale and Foster City Boulevards Median Refurbishment - PK-03 - City of Foster City
Alteration
Conception
$500,000 est. value
Foster City, CA 94404

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Hawes Park Synthetic Turf Field Replacement Project
Infrastructure
Design
$944,710 CJ est. value
Redwood City, CA 94061

Replace Culvert, Drainage and Erosion Control
Infrastructure
Bidding
$18,000,000 CJ est. value
Belmont, CA 94002

Install Signal and Lighting System, Place RHMA (Gap Graded)
Infrastructure
Bidding
$1,370,000 CJ est. value
Daly City, CA 94015

Smooth Streets Program
Infrastructure
Post-Bid
San Mateo, CA

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Daily City DMV Field Office
Term Contract, Infrastructure
Post-Bid
Daly City, CA 94015

Citywide Street Reconstruction Phase 2
Infrastructure
Results
$1,600,000 est. value
San Mateo, CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

Millbrae Serra Station
New Construction, Infrastructure - 294,000 SF
Pending Verification
$460,000,000 CJ est. value
Millbrae, CA 94030

Millbrae Serra Station
New Construction, Infrastructure - 294,000 SF
Pending Verification
$460,000,000 CJ est. value
Millbrae, CA 94030

Sea Cloud Park S4 Synthetic Resurfacing - PK-01 - City of Foster City
Infrastructure
Conception
$800,000 est. value
Foster City, CA 94404

Glens Path Project - Phase 2
Infrastructure
Design
$200,000 CJ est. value
Woodside, CA 94062

Last Updated 08/30/2022 06:01 PM
Project Title

F Street Retaining Wall Repair Project

Physical Address View project details and contacts
City, State (County) Colma, CA 94014   (San Mateo County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $284,885 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of the following: o Removing the concrete spalling (areas of the wall where the concrete surfacing is chipping away), removing any unsound concrete around the exposed rebar, cleaning and preparing and patching with high pressure concrete; and o Exposing and cleaning cracks (Any crack over 1/16 inch) and injecting epoxy seal; and o Removal and installation of valley gutters, concrete flat work, wooden retaining structures, and installation of new weep holes, erosion control, cobbles, priming and painting. The work is to be completed within a period of forty (40) working days.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents