Similar Projects
Boat Storage Facility
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Gloucester, MA

Little Beach Pier and Beach Maintenance Project
Conception
Falmouth, MA 02114

Drydock and Overhaul Services for the M/V Gayhead
Bidding
Falmouth, MA

Two Float Replacements
Bidding
Bourne, MA 02532

Rehabilitate Existing Timber at Eastern and Southern Piers
Post-Bid
Less than $618,000 est. value
Boston, MA

Regatta Point Waterfront Rehabilitation
Post-Bid
Less than $618,000 est. value
Boston, MA

Removal and Replacement of Pilings, Floats, and a Gangway Located on the Onset Pier
Results
Less than $339,373 est. value
Onset, MA

Owen Park - Pier Repair for the Harbor Master
Results
Less than $50,000 est. value
Tisbury, MA

Crosby Yacht Yard
New Construction
Construction
Osterville, MA

Neponset Landing II Spray Deck Renovation Demolition
Post-Bid
Less than $800,000 est. value
Boston, MA 02114

Y--Hellcat Trail Boardwalk Replacement @ PR NWR
Results
Newburyport, MA 01950

Owner's Project Manager for New Bedford State Pier
Renovation
Post-Bid
$1,700,000 est. value
New Bedford, MA

Barlows Landing Dinghy Dock Improvement
Results
$260,000 est. value
Buzzards Bay, MA

Middle Wharf Wale System Replaced
Post-Bid
Less than $60,000 est. value
Mattapoisett, MA 02739

Houghs Neck Boat Ramp Reconstruction Project
Results
Less than $750,000 est. value
Quincy, MA 02169

Last Updated 12/12/2019 04:15 PM
Project Title

Z--CACO - Replace Marconi Beach Stairs

Physical Address View project details and contacts
City, State (County) Wellfleet, MA   (Barnstable County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is to completely remove and replace a portion of the access boardwalk and the overlook, stairs, landings and railings at Marconi Beach.

Details

Division 06 - Wood, Plastics, and Composites, Wood Stairs and Railings.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents