Similar Projects
Southborough History Walk Pedestrian Improvements
Post-Bid
$380,000 est. value
Southborough, MA 01772

Town Center Improvements Project
Post-Bid
$900,000 est. value
West Brookfield, MA

Scheduled and Emergency Sidewalk and ADA Improvements and Related Work at Various Locations (Including Marthas Vineyard)
Results
Less than $670,000 est. value

Asphalt Sidewalk Replacement
Results
$45,000 est. value
Leicester, MA 01524

Clinton Savings Bank
New Construction
Construction
Shrewsbury, MA 01545

Chase Bank
New Construction - 3,580 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Milford, MA 01757

Shared Streets Pedestrian Improvements Project
Post-Bid
Less than $200,000 est. value
Southbridge, MA

Sidewalk and ADA Improvements at Various Locations
Results
Less than $1,148,661 est. value

Milford Road Sidewalk Project
Post-Bid
$500,000 est. value
Grafton, MA 01560

Sidewalk and ADA Improvements at Various Locations
Results
$1,024,018 est. value

Reclaim and Repaving Parking Lots and Driveways
Post-Bid
Fiskdale, MA

Sidewalk Reconstruction
Results
$612,892 est. value
Fitchburg, MA

Walkway Repair
Infrastructure
Post-Bid
Lunenburg, MA

Sidewalk and Curb Ramp Replacement
Results
$71,586 est. value
Auburn, MA 01501

Concrete Walkway Repair
Infrastructure
Post-Bid
$10,000 est. value
Leominster, MA

Last Updated 06/17/2022 08:37 AM
Project Title

Gold Star Boulevard Bank

Physical Address View project details and contacts
City, State (County) Worcester, MA 01606   (Worcester County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Bank, Sidewalks/Parking Lot
Contracting Method Bids by Invitation.
Project Status Design Development, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and new construction of a mixed-use development in Worcester, Massachusetts. Design plans call for the construction of a 5,000-square-foot financial development; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and financial development. Plans call for the construction of a 5,000-square-foot financial facility. As of June 14, 2022, a definitive site plan is pending approval from the City of Worcester. The parking plan was approved by the Worcester Planning Board on September 29, 2021. An architect has been selected. Information regarding a general contractor or selection has not been disclosed. A firm construction timeline has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Bank, 1 Story Above Grade, 5,000 SF New Construction, Drive-thru.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents