Similar Projects
B402 Elevator Replacement Tomah VA Medical Center
Term Contract
Design
$2,000,000 to $5,000,000 est. value
Tomah, WI 54660

Install New Elevator B-23
Infrastructure
Design
$3,000,000 to $5,000,000 est. value
Tomah, WI 54660

Elevator Maintenance Services
Term Contract
Bidding
Chicago, Hines, North Chicago, IL - Milwaukee, WI 60612

Elevator Modernization
Renovation
Post-Bid
Racine, WI 53403

Milwaukee Prisoner Elevator Modernization
Post-Bid
$500,000 to $1,000,000 est. value
Milwaukee, WI 53202

U009--Sources sought - SwissLog Pneumatic Tube System Onsite Training at the MIlwaukee VAMC
Results
Milwaukee, WI 53295

Multi-Building Elevator Single Bottom Jack Replacement
Results
$2,925,000 est. value
Madison, WI 53706

Elevator Maintenance and Repair Services
Term Contract
Post-Bid
WI

Central Maintenance Facility Lift Replacement
Results
Eau Claire, WI 54703

Elevator and Escalator Maintenance and Repair Services (Group 2)
Term Contract
Post-Bid
WI

City Hall 2021 Elevator Modification and Upgrade
Results
$480,000 est. value
La Crosse, WI

Elevator and Escalator Maintenance and Repair Services (Group 1)
Term Contract
Post-Bid
WI

Elevator Maintenance
Alteration
Results
Madison, WI 53703

Doyle - 2021 Elevator Replacement
Alteration
Post-Bid
Madison, WI 53703

Village on Park Elevator Replacement of Power Unit and Hydraulic Jack
Alteration
Results
Madison, WI 53713

Reported 03/16/2022 12:00 AM
Project Title

VLM (Vertical Lift Machine) Disassembly and Relocation

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 115th Fighter Wing, Wisconsin Air National Guard, has a requirement to disassemble VLMs (Vertical Lift Machines) and palletize/crate them in a manner that they can be efficiently stored on-site. After an anticipated construction project is completed, the contractor will install/reassemble the VLMs to full working order. There are five VLMs, model Remstar Shuttle-XP-500-2450X864-US. This project will include: -Create backup file of current machine settings. -Remove any empty trays. -Disassemble height modules. -Unwire/disconnect internal cables. -Disassemble base unit. -Build crates and skids for storage. -Stack and band empty trays. -Stack and crate exterior skin panels. -Stack and crate exterior load columns. -Stack and crate shelf rail panels. -Crate base unit. -Ensure that crates can be moved by use of 10K forklift. -Upon building 510 construction completion, re-assemble and program VLMs. -Assemble machines in new location. -Government will notify contractor 6-8 weeks prior to installation and provide specific location in building 510 of where VLMs will be installed. -Completely re-wire internal components. -Power up VLMs. -Test controls. -Load parameters from back-up files. -Test VLM movement and stopping distance. -Load and store tray data for empty trays. -Test VLM with government present to verify VLM operates to governments’ expectation.

Details

Division 14 - Conveying Equipment, Lifts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents