Similar Projects
Refractory Replacement for a Bio-mass Chip Boiler
Bidding
Hyde Park, VT 05655

Boiler and Pump Replacement
Bidding
Belvidere, Belvidere Center, VT 05442

Renovations of HVAC in Dormitory Buildings
Post-Bid
$1,000,000 to $5,000,000 est. value
Vergennes, VT 05491

Weatherization Program Services - Heating Contractors
Post-Bid
Addison, Chittenden, Franklin, Grand Isle, VT

Unit Vent Replacement - Rutland Town School
Results
Rutland, VT 05701

Wastewater Treatment Facility Digester Boiler Replacement
Results
Barre, VT 05641

Heat Pump Installation at Green Mountain Technology and Career Center
Bidding
Hyde Park, VT 05655

Heating Contractors for Weatherization Assistance Program
Post-Bid

Town Buildings HVAC
Term Contract
Results
Colchester, VT

Wright Hall Chiller Replacement
Post-Bid
Burlington, VT 05401

Police Department Ventilation System
Results
White River Junction, VT 05001

2020 Pellet Boiler Miller’s Run Elementary School
Post-Bid
Sheffield, VT 05866

Hinesburg Community School Kitchen Ventilation Upgrade
Results
Hinesburg, VT 05461

Bugbee Senior Center Heat Pump System
Post-Bid
White River Junction, VT 05001

Inline Fan Install, Saint Albans Federal Building, Saint Albans, Vt
Results
Saint Albans, VT 05478

Last Updated 05/06/2021 12:29 PM
Project Title

Chamberlin Elementary School Positive Ventilation System

Physical Address View project details and contacts
City, State (County) South Burlington, VT 05403   (Chittenden County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of the installation of a positive ventilation system for the Gertrude E. Chamberlin Elementary School. The scope of work includes, but is not limited to, the following: selective demolition, installation of new ventilation systems to serve all classroom spaces, closure and infill of the unit ventilator openings in the facade, miscellaneous mechanical and electrical work, and potential removal of regulated materials.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents