Similar Projects
Last Updated | 12/22/2022 03:08 PM |
Project Title | Sidewalk Infill Project |
Physical Address | View project details and contacts |
City, State (County) | Topeka, KS 66612 (Shawnee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project constructs both new sidewalks and restores existing sidewalks to provide for continuous compliant pedestrian connectivity. This project is Phase 1 and is located in the Tennessee Town Neighborhood between SW 10th Street and & SW 13th Street between SW Washburn Avenue & SE Madison Street as identified in the aerial location maps. American Rescue Plan Act (ARPA) contractual provisions apply and are attached to the bid. Q And A Open 22/11/2022 03:31:00 Q And A Close 17/12/2022 04:30:00 Project consists of City-wide replacement of Curb & Gutter with varying types and quantities. Project locations may include additional work associated with or affected by the construction activities of replacing curbs and gutters. All bids must be accompanied by a cashier's check or a bid bond for not less than five percent (5%) of the amount bid (including alternates), made payable to the City of Topeka, Kansas. The original bid security shall be in the office of Contracts and Procurement before the 2:00 closing date. All persons seeking to enter into a contract with the City shall submit an acceptable affirmative action program in accordance with Section 2.135.130 of the Code of the City of Topeka, Kansas. Bidders shall take note of requirements for notification of MBE's and WBE's as stated in paragraph 24 of the Instruction to Bidders. ; 9% minority and 6.9% female. 4" Concrete Sidewalk 5' wide 4" Concrete Sidewalk 6' wide 6" Concrete Sidewalk 5' wide 8" Concrete Sidewalk 5' wide 6" Concrete Edge Curb Borrow Material/Select Fill or AB-3 Combined Concrete Sidewalk and Retaining Wall Project consists of City-wide replacement of Curb & Gutter with varying types and quantities. Project locations may include additional work associated with or affected by the construction activities of replacing curbs and gutters. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |