Similar Projects
Polk-Quincy - 701048.0 - City of Topeka
Infrastructure
Conception
$7,000,000 est. value
Topeka, KS

South Kansas Avenue(4th to 6th Avenue) - 841095 - City of Topeka
Alteration
Conception
$892,045 est. value
Topeka, KS 66630

New Washburn Rural Middle School - 2022 Bond - Auburn Washburn Public Schools
New Construction, Infrastructure - 146,000 SF
Design
$64,000,000 CJ est. value
Topeka, KS 66619

New Washburn Rural Middle School - 2022 Bond - Auburn Washburn Public Schools
New Construction, Infrastructure - 146,000 SF
Design
$64,000,000 CJ est. value
Topeka, KS 66619

Replacing Deck on Shelter House
Infrastructure
Bidding
$20,000 CJ est. value
Topeka, KS 66609

Concrete Pads and Conduits
Renovation, Infrastructure
Bidding
$60,000 CJ est. value
Topeka, KS 66612

SE 6th and Branner Intersection Sidewalk Ramp and Median Replacement
Infrastructure
Post-Bid
Topeka, KS 66630

2021 North Topeka West Sidewalk Improvement
Infrastructure
Post-Bid
Topeka, KS

Shawnee Heights MS Parking Lot Improvements
Infrastructure
Results
Tecumseh, KS 66542

Curb and Gutter Replacement
Infrastructure
Results
Topeka, KS

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

Downtown Ramada Hotel & Convention Center Remodel
Build-out
Pending Verification
$4,882,168 CJ est. value
Topeka, KS 66607

South Topeka Boulevard from 15th to 21st - 701045 - City of Topeka
Infrastructure
Conception
$4,700,000 est. value
Topeka, KS 66630

Last Updated 12/22/2022 03:08 PM
Project Title

Sidewalk Infill Project

Physical Address View project details and contacts
City, State (County) Topeka, KS 66612   (Shawnee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project constructs both new sidewalks and restores existing sidewalks to provide for continuous compliant pedestrian connectivity. This project is Phase 1 and is located in the Tennessee Town Neighborhood between SW 10th Street and & SW 13th Street between SW Washburn Avenue & SE Madison Street as identified in the aerial location maps. American Rescue Plan Act (ARPA) contractual provisions apply and are attached to the bid. Q And A Open 22/11/2022 03:31:00 Q And A Close 17/12/2022 04:30:00 Project consists of City-wide replacement of Curb & Gutter with varying types and quantities. Project locations may include additional work associated with or affected by the construction activities of replacing curbs and gutters. All bids must be accompanied by a cashier's check or a bid bond for not less than five percent (5%) of the amount bid (including alternates), made payable to the City of Topeka, Kansas. The original bid security shall be in the office of Contracts and Procurement before the 2:00 closing date. All persons seeking to enter into a contract with the City shall submit an acceptable affirmative action program in accordance with Section 2.135.130 of the Code of the City of Topeka, Kansas. Bidders shall take note of requirements for notification of MBE's and WBE's as stated in paragraph 24 of the Instruction to Bidders. ; 9% minority and 6.9% female. 4" Concrete Sidewalk 5' wide 4" Concrete Sidewalk 6' wide 6" Concrete Sidewalk 5' wide 8" Concrete Sidewalk 5' wide 6" Concrete Edge Curb Borrow Material/Select Fill or AB-3 Combined Concrete Sidewalk and Retaining Wall Project consists of City-wide replacement of Curb & Gutter with varying types and quantities. Project locations may include additional work associated with or affected by the construction activities of replacing curbs and gutters.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents